Laserfiche WebLink
i <br /> :t Mr Kyle Christie � <br /> January 11, 1995 <br /> Page 4 <br /> SUMMARY OF WORK <br /> Work Completed in Third Quarter 1994 <br /> • Continued monitoring of the GWES, including sampling of the system Reduced the <br /> pumping rate of the extraction well to approximately S gpm <br /> • Prepared and submitted second quarter 1994 groundwater monitoring and remediation <br /> system evaluation report <br /> • Sampled site groundwater monitoring wells for third quarter 1994 Sampling <br /> performed by GTI <br /> • Installed new SVE/AS wells <br /> • 1-iepared wastewater discharge report to the City of Stockton <br /> • Submit revised air permit for the SVE/AS system <br /> Work Anticipated During Fourth Quarter 1994 <br /> • Continue monitoring and optimizing of the GWES-including-sampling-of_the system <br /> • Prepare and submit third quarter-1994 groundwater--monitoring and remediation system <br /> evaluation report <br /> • Construct and begin operation of the SVE/AS system <br /> • Perform compliance testing and reporting <br /> • Sample groundwater monitoring wells for fourth quarter of 1994 Sampling to be <br /> performed by GTI <br /> • Begin preparation of fourth quarter 1994 groundwater monitoring and remediation <br /> systems evaluation report <br /> • Prepare wastewater discharge report for City of Stockton <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 12671REPORTSORD94WR RPT <br />