Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Mr Kyle Christie <br /> January 11, 1995 <br /> Page 5 <br /> • Drill and install two off-site groundwater monitonng wells to the south of the ARCO <br /> facility A third groundwater monitoring well will be installed west of the ARCO <br /> facility if access is granted from CalTrans <br /> If you have any questions regarding this quarterly report, please contact me at (916) 444-0123 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> Steve Misner Pat Cullen <br /> Project Manager Calitornia Registered Geologist #4932 <br /> SDM PGC ksc <br /> Enclosures <br /> cc Mr Brett L Hunter, Chevron <br /> Ms Mary Meays, San Joaquin County Health Department <br /> Ms Elizabeth Thayer, California Regional Water Quality Control Board, <br /> Central Valley Reason <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 12671REPORTS13RD94QTR RPT <br />