My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000472
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000472
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:16:33 PM
Creation date
2/7/2019 2:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000472
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S v • .. <br /> WORK PLAN <br /> FOR <br /> " - INSTALLATION OF ON-SITE SOIL VAPOR EXTRACTION <br /> ` AND-AIR SPARGE WELLS <br /> ARCO STATION 2133, STOCKTON, CALIFORNIA <br /> This work plan was prepared for ARCO Products Company (ARCO) for continuing <br /> activates at ARCOStation2_133, located-at 2908 Benjamin-Holt Drive, Stockton;California -=-- <br /> work plan was prepared in accordance with Task Order 2133-94-4A between Brown and <br /> Caldwell (BC) and ARCO The work plan will be submitted to ARCO, and the San Joaquin <br /> County Department of Environmental Resources (County) Before commencing work, all <br /> necessary permits will be acquired,, and approval,of the work plan will be obtained from the <br /> County Work will commence within 30 days upon County approval of this work plan <br /> This work plan was completed to perform the installation of five soil vapor extraction (SVE)` <br /> ru " <br /> -,-and three air sparge_(AS) wells- This work plan describes the methods to be used in the field- <br /> during borehole dnlltng, and SVE and 'AS well installation This .play proposes a project - <br /> -_- -- _ <br /> _-schedule for work at-the site and the+timely subrrmittal of a-site summary report to'the County - --n <br /> �after-the_comDie tin n-o Lthio,-nh;)cP-nt_wnrlr <br /> PURPOSE <br /> r <br /> his-work-plan,presentsythe:details-for=installing-five=on-site-SVE=and=three-AS°welis�Two <br /> of the wells will be dual-completion SVEJAS wells The purpose of installing these wells is to <br /> -remediate=hydrocarbon affected=soils=S-d=groundwater—SVE wells are used to remove <br /> _hydrocarbons from the soil under"a vacuum MAS-we lls_are-used_to_inject"air-into=the,groundwater - <br /> thereby volatilizing hydrocarbons and promoting biologic degradation of hydrocarbons The <br /> proposed well locations are shown on Figure 1 <br /> INSTALLATION AND CONSTRUCTION OF SVE AND AS WELLS <br /> This"section describes the field methods for SVE and AS well construction Standard field <br /> procedures for well completion are described in Appendix A ARCO will be responsible for the - <br /> proper rywell destruction when the County agrees that they are no longer necessary " y <br /> This is a draft report and is not intended to be a final representation of the work done or recommendations ,Wade by <br /> Brown and Caldwell It should nor be relied upon consult the final report <br /> 1506WEPOPTSWORKPLAN <br /> , J <br />
The URL can be used to link to this page
Your browser does not support the video tag.