Laserfiche WebLink
7 <br /> The air spar-ma wells will be screened entirely below the groundwater and the surface <br /> vapor extraction wells will be screened from 2 feet below the groundwater surface to within 5 <br /> feet of the ground surface The dual-completion SVE and AS (V-9/S-7 and V-10/S-8) wells are <br /> designed for soil vapor extraction and sparging of groundwater in a single borehole <br /> - - Groundwater is currently estimated at 15 to 18 feet below ground surface (bgs) The two - <br /> dual-completion wells will be dnlled using a truck-mounted drilling rig equipped with <br /> 10-inch-outside-diameter hollow-stem augers Each borehole will be advanced to approximately <br /> 25 feet bas Single-completion SVE and AS wells will be drilled using 8-inch-outside-diameter <br /> augers Each single-completion SVE well borehole will be advanced to approximately 20 feet <br /> be Each single-completion AS well borehole will be advanced to 25 feet bgs Standard drilling <br /> procedures are described in Appendix A Borehole cuttings will be temporarily placed on plastic <br /> sheeting and covered with plastic The disposal of these cuttings is the responsibility of ARCO <br /> Soil Sampling <br /> Soil samples for Iithologic classification will be collected every 5 feet from all boreholes <br /> to the total depth of each borehole Soil samples for laboratory analysis will be collected from <br /> 5, 10, and 15 feet below ground surface from boreholes V-10/S-8. V-9/S-7, and V-12 and from <br /> 15 foot bgs from borehole S-9 Soil samples were collected from 5 and 10 feet in borehole AS-5 <br /> (next to proposed borehole S-9) during a previous investigation Due to the adequate <br /> characterization of the soil from previous investigations, soil samples from boreholes V-1I and <br /> V-8 will not be collected for laboratory analysis Field readings of soil vapors (using a PID or <br /> FID) will be monitored and noted from each sample A Iithologic log of each borehole will be <br /> completed according to the Unified Soil CIassification System The boreholes will be loafed by <br /> a professional geologist working under the direct supervision of a registered geologist Standard <br /> soil sampling procedures are described in Appendix A <br /> Soil samples will be analyzed for benzene, toluene, ethylbenzene, total xylenes (BTEX) and <br /> total petroleum hydrocarbons as gasoline (TPH-G) by U S Environmental Protection Agency <br /> (EPA) Methods 8020 and 8015 Modified, respectively Stockpiled soil will be sampled for <br /> disposal purposes on a I-week turnaround In addition to the above constituents, the stockpile <br /> soil samples will be analyzed for reactive sulfides and cyanides by EPA Method 9010, corrosivity <br /> (pH) by EPA Method 9045, Ignitability (flash point) by EPA Method 1010, and Soluble <br /> Threshold Limit Concentration lead by EPA Method 6010/7000 series <br /> Use or disclosure of data contained on this sheet is subject to the restriciton specified at the beginning of this <br /> document 15061iLEPORTSSWORKPCAAI <br /> �r <br />