Laserfiche WebLink
S E C 0 R <br /> . by a neat cement seal, extending from the top of the bentonite transition seal to the ground <br /> surface The boring logs show well construction details <br /> The development procedure for each well consisted of swabbing the screen interval and <br /> pumping or bailing approximately ten casing volumes of water from the wells <br /> Soil Cuttings and Purge Water <br /> Soil cuttings generated during drilling operations and water generated during equipment <br /> cleaning and sampling were stored onsite in 55-gallon drums onsite pending <br /> characterization The soil and water will be removed from the site by a licensed disposal <br /> contractor and transported to an appropriate disposal or treatment facility for proper disposal <br /> Laboratory Procedure <br /> Soil samples exhibiting positive PID detections or a minimum of three samples from each ; <br /> boring (including the deepest sample) were analyzed for TPHg, BTEX, and fuel oxygenates <br /> (MtBE, EtBE, DIPE, TAME, TBA, EDB, 1,2-DCA, and ethanol) by EPA Method 82608 <br /> { <br /> h <br />