Laserfiche WebLink
Y. <br /> k Chronology - 3128 W. Ben Holt Dr. $ Page 3 <br />' 11 <br /> Mail verification that certified mail received 1017. 30 days starts from <br /> 1 fl10719fi US Ma <br /> today. ,t <br /> I' <br /> 11/05/96 MI calls CVRWQCB and James Brathovdeconf,r'ms that there is no <br /> dispute with closure and letter to follow. Mil notifies Marla Guensler, <br /> EXXON, that workplan for monitoring wells`destruction or monitoring plan <br /> being issue <br /> d. <br /> ' d riot to NFA letter b g <br /> is to be submitted p <br /> I� <br /> 11/07/96 MI mails comment letter to EXXON with options for NFA. <br /> 11/22/96 MI receives workplan to over bore all existing monitoring wells. Check <br /> #2151 (Delta) received along with application fork Soils Exploration <br /> Services, C-57 #582696 to do the work. <br /> 11/26/96 M approves MI reviews and a workplan. Baring permit SR# 011079 assigned r <br /> P <br /> for work. <br /> 11/27/96 MI issues permit SR#011079, deposits check, advises SES, sets <br /> appointment for 1214, and reviews CVRWQCB letter from James Bennett, <br /> acting Executive Officer verifying this and other sites ok for NFA. <br /> 12/04/96 Onsite for MW-3 and MW-6 destruction. More time required for last two k <br /> monitoring wells (#4 & 5) after rains stop. p <br /> 12/20/96 Last two monitoring wells (#4 & 5) destroyed today. Completes all site <br /> requirements. OK to issue NFA upon MI return 12130. ' <br /> 12/30/96 MI issues NFA, updates chronology, and Case Closure Summary <br /> (detailing wells destroyed and prepped for birecior's signature). SITE <br /> CLOSED---NO FURTHER ACTION, '�� <br /> 11 r I <br /> li <br /> 4 I it <br /> �1 <br /> ' I <br /> fh <br /> :F <br />