My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS PR0544112
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
3500 - Local Oversight Program
>
PR0544112
>
ARCHIVED REPORTS PR0544112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:43:00 PM
Creation date
2/7/2019 3:33:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
PR0544112
RECORD_ID
PR0544112
PE
3528
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A filter pack shall be placed to enclose the entire Iength of the screened section with <br /> an additional 2 feet of filter pack above the screened section. Filter pack material and <br /> size is anticipated to be Monterey Sand Number 3. <br /> F� Directly on top of the filter pack will be a 2 foot bentonite plug designed to prevent <br /> vertical migration of possible contaminants through the annulus. The bentonite pellets <br /> shall be emplaced into the annulus by tremie pipe. <br /> The remaining annular space(above the bentonite plug to surface)will be sealed using <br /> a mixture of 95% Portland cement/5% bentonite powder. This annular seal will be <br /> installed by tremie pipe. This seal will be allowed to set for at least 24 hours before any <br /> subsequent activities such as well development or sampling. <br /> The top of each monitoring well will be protected by a water-tight locking cap with <br /> lock and will be inside a flush-mounted, water-tight traffic box mounted in concrete and <br /> sloped to about.one-inch above grade to drain away surface water. <br /> Each monitoring well location will be surveyed by a California-registered land <br /> surveyor for exact surface location and for exact elevation relative to the USGS MSL <br /> datum. The elevation will be surveyed at a measuring point marked on the top of the <br /> well casing, which is he point from which all water level measurements shall be <br /> record:d. <br /> 3.5 Well Development <br /> Welf development will commence at least 24 hours after installation hof thee:-annular <br /> sear. Development will be performed by mechanical.surging:afi&bOjff ..`with a bailer <br /> and/or surge block. Evacuation of 3 to: 5 casing volumes f per well is expected. <br /> y Tempeafature, .pH, and specific conductivity parameters will be measured in the field <br /> during development. <br /> . 3.6 Groundwater Sampling <br /> .: Each monitoring well will be measured for static water level with a battery-powered <br /> sounder before sampling activities begin and after purging, with a precision of+or- 0.01 <br /> ft. All measurements will be recorded as depth-to-water from a surveyed measuring <br /> point. Depth-to-water readings will be converted to water-levet elevations referenced to <br /> the USGS MSL datum. <br /> The "standing-water in each well will be purged before sampling. This will begin no <br /> sooner than 72 hours following well developrrant. Equipment used will be a Teflon <br /> bailer. Each well will be purged until 3 to S well volumes are removed. During purging, <br /> the parameters of temperature,pH,and specific conductivity will be measured. Sampling <br /> will be performed after these parameter readings have stabilized for 2 consecutive casing <br /> volumes. In the event that recharge rates do not permit at least 3 consecutive well <br /> volumes to be purged, and the well is purged dry, the sample will be collected after the <br /> well sufficiently recovers. The water will be retested for temperature, pH, and specific <br /> conductivity after sampling to measure purging efficiency. <br /> _10- <br /> 172-32-RI 318)91 <br /> 10- <br /> 172-32-R13!8191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.