My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BETHANY
>
17103
>
2900 - Site Mitigation Program
>
PR0524391
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 5:44:02 PM
Creation date
2/7/2019 3:58:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524391
PE
2965
FACILITY_ID
FA0016362
FACILITY_NAME
MOUNTAIN HOUSE WWTP
STREET_NUMBER
17103
Direction
W
STREET_NAME
BETHANY
City
TRACY
Zip
953917301
CURRENT_STATUS
01
SITE_LOCATION
17103 W BETHANY
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional Groundwater and Agriculture Drain Monitoring Work Plan <br /> Residential Neighborhood G <br /> April 18,2005 <br /> Page 5 <br /> The groundwater samples will be collected with a clean, disposable bailer and transferred to laboratory- <br /> supplied containers. Each container will be labeled for sample identification and placed in a cooler chilled <br /> with ice. Upon completion of the fieldwork, the groundwater samples will be delivered under chain-of- <br /> custody procedures to a state certified laboratory for analysis. <br /> 4.5 SAMPLING FREQUENCY <br /> Monitor wells will be sampled monthly for one year. Following the first year of sampling, the monitor <br /> wells will be sampled semi-annually during the second and fourth quarters. The sampling events will be <br /> coordinated with and conducted at the same time as the sampling of the previously-installed monitor <br /> wells. <br /> 4.6 LABORATORY ANALYSIS <br /> Groundwater samples collected from the three deep monitor wells intended to monitor groundwater will <br /> be analyzed for total coliform, total dissolved solids, nitrate, and electrical conductivity. Water samples <br /> collected from the three shallow monitor wells designed to intercept irrigation drainage, water will be <br /> analyzed for total coliform, total dissolved solids, ammonia as nitrogen,nitrate as nitrogen, total nitrogen, <br /> electrical conductivity, and biological oxygen demand. Tables IA and 113 summarize the laboratory <br /> methods, detection limits, and holding times required in the MRP. <br /> Table IA: Groundwater Monitoring Sample Plan <br /> Type Methods Size of Container Preservatives Holding Times <br /> Total Coliform Organism Grab 9221.B 125mL(plastic) See Note 24 hours <br /> Total Dissolved Solids Grab 180.1 1 Liter(plastic) None" 7 days <br /> combined <br /> Groundwater Elevation Field <br /> Nitrates(NO3) Grab 300 1 Liter(plastic) None" 48 hours <br /> combined* <br /> Electrical Conductivity Grab 120.1 1 Liter(plastic) <br /> combined None" 28 days <br /> Note: No preservative is used unless a high chlorine content is present; then sulfur is used to <br /> dissolve the chlorine. - <br /> *Sample is usually combined(Total Dissolved Solids,Nitrates,Electrical <br /> Conductivity). <br /> "Must be kept cool. <br /> �a CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.