My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BEVERLY
>
104
>
2900 - Site Mitigation Program
>
PR0540667
>
SITE INFORMATION AND CORRESPONDENCE 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 8:26:21 AM
Creation date
2/7/2019 4:56:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2011-2015
RECORD_ID
PR0540667
PE
2960
FACILITY_ID
FA0023252
FACILITY_NAME
WELDON CHURCH PROPERTY
STREET_NUMBER
104
Direction
W
STREET_NAME
BEVERLY
STREET_TYPE
PL
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
104 W BEVERLY PL
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br /> Just to clarify about the air sampling: <br /> 1) Now that the mitigation system is operational we are approved to collect indoor and <br /> ambient air samples every six months, meaning since the system went online in <br /> late June we should schedule indoor and ambient air sampling for late December <br /> 2012? And then 6 months later? <br /> 2) Approval for crawl space sampling, are you referring to an air sample collected from <br /> the mitigation system PVC riser or from the actual crawl space using Summa <br /> Canisters as we have done before? <br /> 3) 1 ask for clarification because I might have confused the situation by just stating we <br /> were going to install a sampling port in the PVC riser to evaluate the air extracted <br /> from the crawl space instead of requesting approval to do that. This was never <br /> proposed or discussed with you; I just thought it might be a good idea to collect one <br /> air sample to see what we are extracting. What do you think about this? Should we <br /> collect an air sample from the PVC riser or just wait and collected a sample from <br /> the crawl space in 6 months? <br /> Sorry if I caused any confusion. <br /> And thank you very much for the update regarding the other sites. <br /> Have a good day and talk to you soon. <br /> Sincerely, <br /> Brian W. Millman <br /> California Professional Geologist#8574 <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton • Santa Rosa • Monterey • Brea • Spokane • Reno • Dallas <br /> 1-800-511-9300 <br /> bmillman@advgeoenv.com <br /> www.advgeoenv.com <br /> This email/fax message is for the sole use of the intended recipient(s)and may contain confidential and privileged <br /> information.Any unauthorized review, use,disclosure or distribution of this email/fax is prohibited. If you are not the intended <br /> recipient, please contact the sender by email/fax and destroy all paper and electronic copies of the original message <br /> From: Vicki McCartney [EH] rmailto:vmccartnek@sjcehd.coml <br /> Sent: Thursday, July 26, 2012 2:43 PM <br /> To: bm_illman(&advgeoenv.com <br /> Subject: RE: LOP Site Updates, Scheduling, and Inquiries <br /> Good afternoon Brian, <br /> I am pleased to learn that the soil vapor intrusion mitigation system is in operation at the Weldon <br /> Church site at 104 Beverly Place in Tracy. I considered driving by this site today but time <br /> constraints prevented me from doing so. <br /> You mentioned that the first application of injecting five percent RegenOx will take place the third <br /> week of August. You will need a boring permit for the 5 boreholes to be injected. I will be on <br /> vacation from August 9th through August 17th, returning to work on August 20th, so I hope you plan <br /> to do the injections the week of August 20th. <br /> I will plan to be at the site on August 2nd for the sampling event. What time will the field technician <br /> be there? <br /> Our department has approved collecting ambient and indoor air samples every six months after the <br /> 8/8/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.