Page 4 of 5 <br /> soil vapor intrusion mitigation system is in operation, but has not responded to AGE's <br /> recommendation to collect crawl-space samples every six months along with the ambient and indoor <br /> air samples. Please note that the Environmental Health Department approves the collection of the <br /> crawl-space sample every six months now that the system is in operation. <br /> Concerning the sites at 2353 Toste Road in Tracy and 1419 East Charter Way in Stockton, our <br /> department has discussed these sites with Jim Barton and I am preparing Case Closure <br /> Summaries for both sites to be sent to the Regional Board for closure concurrence. <br /> Best Regards, <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Phone: (209)468-9852 <br /> Email: vmccartney(cDsjcehd.com <br /> From: Brian Millman [mailto•bmiliman advgeoenv.coml <br /> Sent: Thursday, July 26, 2012 1:46 PM <br /> To: Vicki McCartney [EH] <br /> Cc: Robert Marty <br /> Subject: LOP Site Updates, Scheduling, and Inquiries <br /> Vicki, <br /> We have not had any contact for a while so I would like to update you on work <br /> performed and upcoming and inquire about the status of a few sites. <br /> Weldon Church (104 West Beverly Place Tracy, CA): <br /> On 25 June 2012, the soil vapor intrusion mitigation system was installed in the crawl <br /> space at the site and has been operating since then. There was an initial delay in <br /> installing the system due to resistance we encountered from the tenant while trying <br /> to gain access to the property. That tenant moved out this month and the property <br /> owner, Lacy Skelton, moved in. Therefore we should not encounter additional access <br /> issues as we move forward with the project. <br /> I have begun the process of coordinating and scheduling the initiation of the in-situ <br /> chemical oxidation pilot test (ISCO) at the site. The pilot test will consist of three <br /> weekly applications of the chemical oxidant with approximately two weeks between <br /> each application. Additionally, based on the draft Monitoring and Reporting Program <br /> a limited sampling event will be performed one week following each application. I will <br /> notify you when I have confirmed the dates for the first application; I anticipate the <br /> first application will take place during the third week of August. <br /> Also, prior to performing the pilot test I would like to schedule a semi-annual ground <br /> water sampling event for 02 August 2012. Wells MW-1, MW-4, MW-7, and MW-8 will <br /> be sampled for TPH-g, BTEX and DCA; the baseline sampling for the pilot test was <br /> performed in January 2012. Additionally, the day of the sampling event a sampling <br /> port will be installed in the PVC riser of the vapor intrusion mitigation system and an <br /> air sample will be collected to evaluate the air being extracted from the crawl space. <br /> 8/8/2012 <br />