Laserfiche WebLink
SWRCB,January 2002 Page_of O <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By B Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> n Other(Spec) <br /> Test Method Used: N Pressure ❑Vacuum O Hydrostatic <br /> G Other(Specify) <br /> Test Equipment Used: EM Equipment Resolution: Z �$ <br /> Piping Run# :5 Piping Run#_,, Piping Run#T Piping Run#" <br /> Piping Material: }-1 9 t72L LA->5 T <br /> Piping Manufacturer: p, S:Y-1 i—V- <br /> Piping Diameter: if ' <br /> Length of Piping Run: 1a 0 FT- <br /> Product <br /> !Product Stored: �f t1 �vLL •� <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuurn/water and <br /> starting test: <br /> Test Start Time: 4 S <br /> Initial Reading(Rj): <br /> r <br /> Test End Time: j `✓ <br /> Final Reading(RF): P15: j <br /> Test Duration: W <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> 'I`•est Resutt- . .. :. ::8, P<is� f};Ftfil ,. � P> . . t�;Fa� ;'; i3.Pas .fl-Fa3J; �')E��gx ,. C3 Fut ;' <br /> Comments—(include information on repairs-.rnade'prioP to testing,and recommended follow-up forfailed tests) <br /> \ i <br />