Laserfiche WebLink
SWRCB,January 2002 Page�of� <br /> 6. PIPILNG SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer Cridustry Standard D Professional Engineer <br /> El Other(Speci ) <br /> Test Methwd Used-. D Pressure.Pressure. fy13 Vacuum DH-drostatic <br /> 13 Other(Specify) <br /> Test Equipment Used: Ak-115 MAGA EWj 72.)k MC7-cit Equipment Resolution: 11%1F_1t­i-rC <br /> sump# 27 SUTP# 9-7 sump# 3- <br /> Sump 4 44 <br /> Sump Diameter- if 14 7—1$ <br /> Sump Depth: S9 of.5 <br /> Sump Material: I 13&Y-4 LASS' .4-5-5- <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 32 3Y_ <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: 466D Ze 0 0 <br /> Portion of Sump Tested' <br /> — 3 S ;A* <br /> Does turbine shut down when 110 Yes F-1 No L1 NA <br /> sump sensor detects either product ffiYes CNo\QNA Id Yes DNo DNA N Yes 0 No D NA <br /> or water?' <br /> / , 5-7- <br /> Turbine shutdown response time2* 03 S�q- 275;tC <br /> Is system programmed for fail-safe U Yes ONo DNA NA No No DNA-17I.O'Yei 11 ®Yes C1 El <br /> shutdown?* Yei QNo NA <br /> Was fail-safe verified to be 0 Yes ®No DNA <br /> operational?* ,,D Yes No C7NA L1 Yes ®No DNA 0 Yes Ml No 0 NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: 10 A4 10 <br /> A4 10 M It,) <br /> Test Start Time: i 57 <br /> /7 <br /> Initial Reading(Rj): 0 ")L)Lo 0, <br /> Test End Time: r-, <br /> Final Reading(RF): 0 pC tj'A0 0 0 9 1 0 7-C <br /> Test Duration: 1 A)(,Oj 12 A'LiA) 1 2- Al 1 12 m )m <br /> Change in Reading(Ie�R,): e-10 If 0 0 Lid <br /> V <br /> Pass/Fail Threshold or CAtcfia-.`,,, t <br /> Uvail Q,Fidl <br /> DNo DNA <br /> / <br /> Was sensor removed for testing? ®Yes, ®t Yes DNo DNA VYes []No DNA 8 Yes ONo 0 NA <br /> Was sensor properly replaced and .WY es C1 No 0 NA <br /> verified functional after testin ? @WYes DNo DNA rlifYes CIN, DNA i IN Yes DNo DNA <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> If the testing method does not test the entire depth of the sump,specify how much of the sump was tested. Methods not testing the <br /> entire sump should only be used if the monitoring system provides fail-safe turbine shutdown. (See SVvrRCB LG-160) <br /> 2 With the submersible pump running,place the sensor in product(discriminating sensors should also be placed in water). The time <br /> between placing the sensor in product and the turbine shutting down is the response time. This should be done ifthe secondary <br /> containment testing method used does not test the entire volume of the sump. <br /> This information is not needed if the entire sump is tested- <br />