Laserfiche WebLink
SWRCB,January 2002 Page—3 of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: 11 Piping Manufacturer Cl industry Standard 0 Professional Engineer <br /> 17Other(Specify) <br /> Test Method Used: I Pressure 0 Vacuum E]Hydrostatic <br /> L Other(Specij�) <br /> Test Equipment Used: Equipment Reslti,,n: Z (>S I <br /> A4 0- <br /> Piping Run# Piping Run# 7. Piping Run# Piping Run#4 <br /> Piping Material: Ft P,t(f CA,>-5 Fi 6 e--YL 6 L�\-s Fti3cvu�-cws s <br /> Piping Manufacturer A.0, 5 A-0. 5"'I-A o, <br /> Piping Diameter <br /> Length of Piping Run: 2 C) F FT <br /> Product Stored: L.t#j 4L,�--Vj-fj 9-7 t c 0, S7 "tjtt�", 51 eoy,� <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: �,5" 57 A, I Ail <br /> Test Stan Time: 14 C, <br /> Initial Reading(RI): 1 <br /> Test End Time: 2.0 <br /> Final Reading(P,,): j 5, P-5 1 <br /> Tcst Duration: wig 'Ov Wig e <br /> Change in Reading(RF-RO: L) 0 <br /> Pass/Fail Threshold or <br /> 2 <br /> Criteria. <br /> Comments—(include information on repdrl,�t!�qr-tqtaifty,and recommended follow-up for failed tests <br />