Laserfiche WebLink
SWRCB,January 2002 page of g <br /> 5. SECONDARY POE TESTING <br /> Test Method Developed By: if Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> n Other(specify) <br /> Test Method Used: (I Pressure Cl Vacuum 0 Hydrostatic <br /> 0 Oflw(Spas) <br /> Test Equipment Used. fMkA" 6A4-g, Equipmnt Resolution: --2- 1-51 <br /> -Ak'Tg <br /> Piping Run# Piping Run# Piping Run# <br /> Piping Run# <br /> Piping Material: F1 i3 cru,LA-.5: <br /> Piping Manufacturer: <br /> Piping Diameter <br /> Length of Piping Run: /7-0 F7 <br /> Product Stored: <br /> Method and location of <br /> pip run isolation; <br /> Wait time between applying <br /> pressure&acuum/water and <br /> starting test: I tj <br /> Test Start Time: 9 <br /> Initial Reading(R4): 5 PS <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj):_ 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test tiesuit, 8 ass. 1 Earl fl Pelt '1 E F 7 -: Z-P O.Ymd C3 gasg fail <br /> Comments—(Include information on neand recammende4follow-upLorfaikd tests) <br />