My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37400
>
2900 - Site Mitigation Program
>
PR0527767
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 11:01:14 AM
Creation date
2/8/2019 10:55:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527767
PE
2950
FACILITY_ID
FA0018823
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
37400
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
26512006
CURRENT_STATUS
01
SITE_LOCATION
37400 S BIRD RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Mark Clardy <br /> February 22, 2008 <br /> CONESTOGA-ROVERS <br /> &ASSOCIATES <br /> Yv <br /> Following drilling, the borings will be backfilled with cuttings derived from the borings. Wooden stakes <br /> will be left at each boring location for future identification. <br /> Chemical Analyses: Selected soil samples will be analyzed for TPHcrude by EPA Method 8015M. A 48- <br /> hour turn around time will be requested. <br /> Report Preparation:Following the receipt of analytical results, CRA will prepare a written report, which <br /> will include field procedures, laboratory results,boring logs, and conclusions. <br /> The scope of work described in this work plan will be performed under the supervision of a professional <br /> geologist. <br /> Schedule <br /> CRA has scheduled the drilling for the week of March 10". Prior to beginning the field work, SJCEHD <br /> will need to approve the drilling permit application and the RWQCB will need to approve this work plan. <br /> A written report will be submitted within 60 days of fieldwork completion. <br /> 060140 3 <br /> Worldwide Engineering, Environmental, Construction,end IT Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.