Laserfiche WebLink
���� <br /> 1 <br /> 2-4 <br /> produced during well development and sampling was contained and <br /> temporarily stored on the site in 55--gallon drums pending results of <br /> the analytical tests. <br /> The hollow-stem augers were steam-cleaned prior to use at each <br /> borehole. All soil and groundwater sampling equipment was washed <br /> with laboratory-grade detergent and tap water and then rinsed with <br /> deionized water prior to each use. <br /> It <br /> i <br /> F <br /> < �P <br /> }y. <br /> k <br /> s-� <br />