Laserfiche WebLink
i <br /> KYLE CHRISTIE <br /> PAGE 2 <br /> October 30, 1995, at 10:00 a.m. at the office of PHS/EHD. A summary of this meeting is <br /> addressed in a separate letter. <br /> 1617 W. Fremont St., Stockton ARCO Facility #5450 <br /> PHSIEHD contact - Michael Infurna <br /> Soil contamination was discovered during a recent line replacement. A workplan to investigate <br /> the full extent of the contamination will be submitted to PHS/EHD. <br /> 800 E. Kettleman, Lodi ARCO Facility #2076 <br /> PHD/EHD contact - Mary Meays <br /> Emcon stated that the most recent groundwater sample results continue to confirm that <br /> groundwater has not been impacted by residual soil contamination at this time. A request to <br /> reduce the sampling frequency of the monitoring wells will be made in the next quarterly report. <br /> Arco will perform a long term vapor extraction test to develop a future plan of action for the <br /> site. <br /> 1612 Hammer Lane, Stockton ARCO Facility #548 <br /> PHSIEHD contact - Mary Meays <br /> The pending tank removal was discussed. However, it has not yet been determined if the <br /> tanks will be replaced at this site. Arco will submit a letter clarifying several items in the <br /> workplan that was submitted. The number, location and design of the vapor extraction wells <br /> proposed for the site were discussed and appropriate action will be taken based on data to be <br /> collected at the site. <br /> There has been no response from the property owner for the off-site access request. Emcon <br /> will forward copies of request letters to PHSIEHD for followup. <br /> 2908 W. Ben Holt, Stockton ARCO Facility #2133 <br /> PHSIEHD contact - Mary Meays <br /> The remediation system is fully operational with almost no down time being reported. The <br /> recent release from the dispenser piping was discussed. Approximately 30 gallons of product <br /> has been removed from monitoring well MVII#10 and bailing continues on a weekly basis. The <br /> remedial system has been modified to focus on this area at this time. Dissolved oxygen is <br /> increasing in concentration in the site wells. The third quarter quarterly report is to be <br /> /85 <br /> submitted soon. <br /> East Louise, Lathrop ARCO Facility #6080 <br /> PHSIEHD contact - Linda Turkatte <br /> SITE CLOSED <br /> 225 South Cherokee Lane, Lodi ARCO Facility #760 <br /> PHSIEHD contact - Linda Turkatte <br /> The next submittal for this site is to be a Corrective Action Plan, which will include the design <br /> specifications of the remedial system proposed for the site. The status of operations at other <br /> Arco facilities may change the priority of cleanup at this site. As groundwater contamination at <br /> this site is nominal and being monitored, focusing resources at other sites with a higher priority <br /> appears to be a reasonable approach at this time. PHSIEHD will entertain a proposal for a <br /> reduction in groundwater sampling frequency at this site. <br />