My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
3500 - Local Oversight Program
>
PR0544124
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 3:36:52 PM
Creation date
2/8/2019 3:17:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544124
PE
3500
FACILITY_ID
FA0012144
FACILITY_NAME
ARCO STATION #6080
STREET_NUMBER
85
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
02
SITE_LOCATION
85 LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Kyle Christie <br /> Page 2 <br /> of a monitoring well on his property which should have <br /> completed the northerly delineation of the groundwater plume. <br /> Monitoring wells 3 and 4 in the north portions of the site are <br /> cross gradient and the sample results from these wells <br /> indicate marginal contamination. The necessity for the off <br /> site monitoring well will be evaluated by PHS/EHD. <br /> The vapor extraction system was shut down but is back in <br /> operation after replacement of the catalyst . <br /> 3425 N. Tracy Blvd. , Tracy ARCO Facility #2093 <br /> PHS/EHD contact - Harlin Knoll <br /> ARCO is in the process of securing permits from the City of <br /> Tracy for the installation of the vapor extraction system. <br /> The bid for the installation of the vapor extraction system <br /> should be awarded by the end of June and installation of the <br /> system should begin in July. <br /> Upgradient monitoring well 12 is being considered for <br /> destruction since the water sample results have consistently <br /> been nondetect . Repair of the well heads on some of the <br /> monitoring wells is pending. <br /> 2908 West Benjamin Holt Drive, Stockton ARCO Facility #2133 <br /> PHS/EHD contact - Mary Meays <br /> The operation of the vapor extraction and air sparge systems <br /> was discussed. A preliminary draft of dissolved oxygen <br /> Y readings that were taken from the site since the air sparge <br /> initiation was presented. Monthly measurements of dissolved <br /> oxygen will continue until otherwise notified. Future <br /> quarterly reports will include an evaluation of the expected <br /> time for remediation and a calculated estimate of the volume <br /> and mass of soil and groundwater contamination. <br /> 1612 Hammer Lane, Stockton ARCO Facility #548 <br /> PHS/EHD contact - Mary Meays <br /> Arco indicated that they were in the process of evaluating the <br /> future use of the site, whether it be to replace the tanks or <br /> close the facility. The permitting process for a possible <br /> vapor extraction system has been initiated with the San <br /> Joaquin Valley Unified Air Pollution Control District . <br /> However, at this time, no due date for a Corrective Action <br /> Plan was established. <br /> 800 East Kettleman Lane, Lodi ARCO Facility #2076 <br /> PHS/EHD contact - Mary Meays <br /> Since groundwater contamination continues to not be evidenced, <br /> a proposal to reduce the sampling frequency will be submitted. <br /> There are no immediate plans to initiate soil remediation at <br /> this site . <br />
The URL can be used to link to this page
Your browser does not support the video tag.