Laserfiche WebLink
�y <br /> 1 <br /> 1 <br /> 1 <br /> Kyle Christie <br /> Page 3 <br /> up of the vapor extraction was requested and that due to very <br /> short notice, PHS/EHD staff was unavailable to provide an I <br /> inspection. PHS/EHD requested that the next time a site visit } <br /> is made that PHS/EHD be notified so that an inspection can be <br /> scheduled. PHS/EHD also stressed the importance, once again, <br /> of timely submittal of quarterly reports. PHS/EHD was also <br /> notified that the air sparging system was started-up. PHS/EHD I <br /> requested information regarding the operation of the system <br /> and indicated that no notification of its start-up was <br /> provided. PHS/EHD also stated that the report of the <br /> installation of the additional offsite wells should be <br /> submitted as soon as possible. <br /> 800 East Kettleman Lane, Lodi ARCO Facility #2076 <br /> PHS/EHD contact - Mary Meays <br /> PHS/EHD was provided a copy of the "Fourth Quarter 1994 Status <br /> Report" from EMCON. PHS/EHD requested that the quarterly <br /> report be submitted prior to the scheduled quarterly meeting <br /> in order for PHS/EHD staff to evaluate recent results in order <br /> to discuss site conditions. <br /> 1612 Hammer Lane, Stockton ARCO Facility #548 <br /> PHS/EHD contact - Mary Meays <br /> PHS/EHD was provided a copy of the "Fourth Quarter 1994 Status <br /> Report" from EMCON. PHS/EHD requested that the quarterly <br /> report be submitted prior to the scheduled quarterly meeting <br /> in order for PHS/EHD staff to evaluate recent results in order <br /> to discuss site conditions. PHS/EHD also received a copy of <br /> the site comparison between 1612 Hammer Lane and 225 South <br /> Cherokee Lane which was prepared to evaluate residual soil <br /> contamination. PHS/EHD indicated that the report would be i <br /> reviewed and PHS/EHD comments prepared. <br /> 3425 N. Tracy Blvd. , Tracy ARCO Facility #2093 <br /> PHS/EHD contact - Harlin Knoll <br /> Groundwater and soil contamination exist both on and off site. <br /> ARCO stated a vapor :extraction system would be installed after <br /> receiving an "Authority to Construct" from SJVUAPCD. <br /> Construction should begin and be completed during the second <br /> quarter of 1995 . Onsite remediation will be on line and <br /> operating by the third quarter of 1995 according to ARCO and <br /> Brown and Caldwell. Offsite contamination in monitoring well <br /> MW8 will not be incorporated into the initial system design <br /> but will be monitored and managed in the future. <br /> 85 E. Louise, Lathrop ARCO Facility #6080 <br /> PHS/EHD contact - Linda Turkatte <br /> The annual report was submitted and the wells show nondetect <br /> levels. The possibility of evaluating this site for closure <br /> will be discussed at the next quarterly meeting. <br />