Laserfiche WebLink
Chuck Carmel Page 2 <br /> Site Specific discussions followed. <br /> Facility 2130 at 7906 N. El Dorado Street, Stockton <br /> PHS/EHD contact - Michael Infurna <br /> The lease on this site expires in one year. If the lease is not renewed the tanks will be removed. The <br /> extent of the groundwater contamination plume has not been physically defined. PHS/EHD <br /> recommends additional off-site monitoring wells to the south. The results of the air sparging tests <br /> should be submitted to PHS/EHD. <br /> Facility 2168 at 441 W. Charter Way, Stockton <br /> PHS/EHD contact - Michael Infurna <br /> All seven on-site monitoring wells show evidence of contamination. Off-site wells to define the extent <br /> of the groundwater contamination plume are to be installed. Off-site wells may have to be placed in <br /> Lincoln Street (City of Stockton property) instead of Charter Way/Highway 4 (Cal-Trans Property). <br /> PHS/EHD requested clarification of additives to ARCO gasoline and sampling for halogenated <br /> constituents using EPA method 601. <br /> Facility 6020 at 1711 E. Yosemite Avenue, Manteca <br /> PHS/EHD contact - Michael Infurna <br /> PHS/EHD has not received the results of the first groundwater sample analysis to date. ARCO stated <br /> the results were non-detect for all constituents. The soil contamination has not been laterally or <br /> vertically defined. Remediation will proceed once investigation is complete and equipment is <br /> available. <br /> Facility 2133 at 2908 Benjamin Holt Drive, Stockton <br /> PHS/EHD contact - Mary Meays <br /> The off-site soil boring and monitoring well will be drilled once encroachment agreements with <br /> property owners have been secured. The permit application for the Authority to Construct was <br /> submitted to San Joaquin Valley Unified Air Pollution control in March 1993. A work plan to install <br /> vapor extraction wells will be submitted by May 31, 1993. Construction of the vapor extraction should <br /> begin in July 1993. An additional monitoring well in the northwestern area of the site will be <br /> installed. This well should be included in the work plan for the vapor extraction wells to be submitted <br /> in May. A reduction in the sampling frequency was discussed. Once all additional monitoring wells <br /> have been installed a proposal for reducing the sampling frequency can be submitted. <br /> Facility 548 at 1612 Hammer bane, Stockton <br /> PHS/EHD contact - Mary Meays <br /> The investigation of soil and groundwater contamination will continue until the extent of <br /> contamination is defined. Quarterly sampling and monitoring will continue. Remediation will <br /> proceed when the contamination has been defined and equipment is available. <br /> Facility 2076 at 800 E. Kettleman bane, Lodi <br /> PHS/EHD contact - Mary Menys <br /> The "Problem Assessment/Preliminary Evaluation Investigation Report"which includes the October <br /> 1992 installation of monitoring wells and subsequent groundwater monitoring should be submitted <br />