My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1011
>
2900 - Site Mitigation Program
>
PR0539578
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 4:31:36 PM
Creation date
2/8/2019 4:26:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0539578
PE
2960
FACILITY_ID
FA0022650
FACILITY_NAME
SPINGOLO TRUCKING
STREET_NUMBER
1011
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14324013
CURRENT_STATUS
01
SITE_LOCATION
1011 N BROADWAY AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> LW <br /> r <br /> 08 December 2005 <br /> Lo <br /> AGE-NC Project No. 01-0828 <br /> Page 4 of 9 <br /> { 2.4. STRATIGRAPHY <br /> Generally, light yellowish brown to moderate orange brown, damp to moist, silty clay, clayey silt, <br /> silt, sandy silt, and poorly graded sand were encountered from approximately 5 feet bsg to <br /> approximately 43 feet bsg. Poorly graded sand was encountered between 43 feet and 48 feet bsg in <br /> boring P-2. <br /> r <br /> 3.0. SCOPE OF WORK <br /> The scope of the work includes the advancement of three additional pilot soil borings for the <br /> collection of soil samples and installation of ground water monitoring wells.The scope of work will <br /> include the following tasks: <br /> • Permitting and pre-field work activities; <br /> • Pilot drilling and soil sample collection; <br /> • Monitoring well installation and development; <br /> i, • Laboratory analysis of soil samples; <br /> { • Quarterly ground water sampling and analysis; and <br /> • Preparation of a report of findings. <br /> f <br /> W <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> { <br /> Applicable site assessment permits will be obtained from the EHD.In addition,an update to the site <br /> health and safety plan presently on-file will be prepared in accordance with Occupational Safety and <br /> Health Guidance Manual for Hazardous Waste Site Activities(National Institute for Occupational <br /> Lod Safety and Health Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, <br /> 1985). Prior to mobilization, the proposed well locations will be clearly marked and a utility <br /> clearance obtained through Underground Service Alert. <br /> 3.2. DRILLING AND SOIL SAMPLE COLLECTION <br /> L <br /> AGE proposes to advance three pilot soil borings at the site for the installation of shallow ground <br /> water monitoring wells. Using a CME-75HT truck-mounted drill rig equipped with 8.25-inch <br /> hollow-stem augers;the pilot borings will be advanced to a total depth of 65 feet bsg.The total depth <br /> f <br /> Advanced GeoEnvironmental,Inc. <br /> { <br />
The URL can be used to link to this page
Your browser does not support the video tag.