Laserfiche WebLink
GEO F SGHULEn S HC <br /> r <br /> 1705 N BROADWAY, PO BOR 1312, SMCSTON, CA 95201 <br /> MECHANICAL ELECTRICAL CONTRACTOR <br />.. PHONE: {9-94$`5500 FAH: 209-457-4435 ; <br /> l <br /> October 5, 1994 <br /> I <br /> Public Health Services <br /> San Joaquin County <br /> Environmental Health Division <br /> P. O. Box 388, Stockton, - CA 95201 u <br /> Attn: Donna Heran o ' <br /> Re: Geo F Schuler Inc <br /> Site Code 2577 <br /> �n <br /> Dear Mrs Heron: <br /> On August 24, 1944, we received a letter from your office nr, <br /> stating that AHS-EHD requires sites within LOP to maintain tdweir , <br /> - -investigation-of the -nature of the documrented contamination <br /> leaking underground tanks and that no reportl1had been received <br /> since August 19, 1993. The letter furth.'er directed us to initi- <br /> ate quarterly ground water monitoring antd sampling immediately <br /> and to submit a proposal by Novermber 30'``, 1994, outlining the <br /> next phase of investigation, including altim�e schedule showing <br /> f dates that investigative procedures will} start, end, and dates <br /> reports will be submitted to PHS-EHD. <br /> The tone of your letter indicates that we have been remiss <br /> in our efforts to clear our site of cont#aminlation. This is not <br /> so. Our communications appear to have b'{roke�n down after we sub- <br /> mitted a report from WHF Environmental Consultants dated August <br /> 17, 1993. We received no response to th!e information provided in <br /> that report. We have applied for reimbursement through the <br /> SB2004 program and have received acknowledge;inent of our submis- <br /> sion from the State. <br /> Due to the economy and its impact on the construction busi- # <br /> nese we can no longer afford the luxury of all consultant. We will <br /> attempt to complete the work after receipt of specific written <br /> instructions as to investigation methods''`. <br /> I� <br /> We have one monitoring well at the sitel The original test- <br /> - ing- showed limited concentrations�of�ben.zeneil' and ethyl-benxene.u­ <br /> We propose to sample this well and measure the ground water ele- <br /> vation immediately. We plan to accept bids 'from various Tabora- . <br /> tories to contract to provide this information. Please provide a <br /> description of the desired analysis in wariting and state if a <br /> representative of PHS-EHD need be present to!lwitness the sampling <br /> procedure. ` <br /> At this time we are requesting that� sam�pling be conducted <br /> biannually. We have applied for reimbursement through the SB2004 <br /> program and would like to limit expenses until we receive a let- <br /> i <br /> ter of commitment. <br /> ;1 <br /> Yours truly, <br /> I <br />