My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0024926
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2941
>
2500 – Emergency Response Program
>
CO0024926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 11:23:33 AM
Creation date
2/8/2019 5:26:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
CO0024926
PE
2546
FACILITY_ID
FA0009657
FACILITY_NAME
SUPPORT TERMINAL SVCS INC
STREET_NUMBER
2941
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
14503010
ENTERED_DATE
8/2/2006 12:00:00 AM
SITE_LOCATION
2941 NAVY DR
RECEIVED_DATE
7/17/2006 12:00:00 AM
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
ADMIN
Supplemental fields
FilePath
\MIGRATIONS\N\NAVY\2941\CO0024926.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l� <br /> r; <br />{ upgraded. <br /> • The truck driver needs to be locked out of the terminal for an <br /> appropriate period of time. <br /> 'i Corrective/investigative Actions <br /> kf <br /> Action Von Crites. Lock out the driver for seven days. Do not allow the <br /> truck to return to the terminal until the carrier certifies that the overfill <br /> sensors have been certified to be operating. Do not allow driver to load <br /> at the terminal until he has received additional training on truck rack <br /> E equipment and procedures. Due date: 28 July 2008 <br /> Action Von Crites. Prepare a letter to the carrier that describes actions <br /> to be taken and requesting their plan to provide: ; <br /> - certification that truck overfill sensor systems are maintained <br /> and are tested; and <br /> I - driver training to ensure drivers check for retain prior to <br /> loading. <br /> Follow-up these actions at a meeting with the carrier to ensure Bartlett <br /> has a plan to meet Valero LP procedures and standards. Due date: <br /> y29 July 20081 <br /> • Action Von Crites. Use this incident for a "lessons learned" discussion <br /> during an upcoming terminal safety meeting. Due date: 15 July 2008. i <br /> I! <br /> Investigated By: Shawn Mendoza, Richard Brandes, Sue Johnson <br /> I� I <br />' IF <br /> Submitted By: Richard Brandes <br /> Attachments: none <br /> i <br /> 3 <br /> Approvals: <br /> k <br /> E <br /> I <br /> E Mike Peterson Date <br /> i <br /> Mike Burgett Date <br /> I <br /> f l • I <br /> � I <br /> f� <br /> I <br /> .i <br /> I� <br /> t1 45962 incident investigation report final 7/19/2006 <br /> 0� Page 2 of 2 <br /> 1 ' <br /> l <br /> �� II <br />
The URL can be used to link to this page
Your browser does not support the video tag.