Laserfiche WebLink
ITEI <br /> GROUNDWATER <br /> ❑L�l TECHNOLOGY INC. ` <br /> 1401 Halyard Drive,Suite I40,West Sacramentq,CA 95q%(916)372 4700 <br /> FAX(916)372-8781 <br /> October 23, 1991 Project No. 02320 1837 <br /> Mr. Michael Infurna <br /> San Joaquin Local Health District <br /> Environmental Health Division <br /> 1601 East Hazelton Avenue <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> RE: PROPOSAL FOR ADDITIONAL WORK FOR THE UPS DISTRIBUTION FACILITY, <br /> STOCKTON, CALIFORNIA <br /> 1532 N. BROADWAY <br /> STOCKTON, CALIFORNIA <br /> Dear Mr. Infurna: <br /> This letter is presented by Groundwater Technology, Inc.to propose additional work at the above referenced <br /> site (Figure 1). The proposed additional work includes additional excavation at the waste oil tank <br /> excavation. <br /> PROPOSED ADDITIONAL WORK <br /> TASK 1: SITE-SPECIFIC HEALTH & SAFETY PLAN <br /> An updated Site-Specific Health and Safety Plan has been prepared by Groundwater Technology as required <br /> by the Occupational Health and Safety Administration (OSHA) Standard"Hazardous Waste Operations and <br /> Emergency Response"guidelines (29 CFR 1910.120). The updated Site-Specific Health and Safety Plan has <br /> been prepared by a Groundwater Technology following a complete review of site conditions. The document <br /> will be reviewed and signed by all Groundwater Technology personnel and subcontractors performing work <br /> at the site. <br /> TASK 2: ADDITIONAL EXCAVATION <br /> In order to obtain approval for closure of the former tank pit, Groundwater Technology proposes to <br /> overexcavate the waste oil tank pit approximately 3 feet in each direction (Figure 1). The original dimensions <br /> of the excavation are 5.5'X1 VX10' (Figure 1). This excavation will be performed utilizing a excavator with <br /> a 40-Hour OSHA trained operator. The excavation is estimated to take approximately one day. All site <br /> safety and security protocol will be in accordance with Cal-OSHA standards, as referenced in the site safety <br /> plan. <br /> �5Xr4�X � <br /> AP- <br /> Offices throughout the U.S.,Canada and Overseas <br />