My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011680
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2900 - Site Mitigation Program
>
PR0001522
>
ARCHIVED REPORTS XR0011680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 3:37:29 PM
Creation date
2/11/2019 2:46:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011680
RECORD_ID
PR0001522
PE
2951
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZQWM- a method of excavation whereby the faces of an excavation or trench are laid <br /> back to provide protection from moving ground. <br /> BVil - the earth material that is removed in the formation of an excavation. <br /> 2dn=- the horizontal members of the shoring system whose sides bear against the <br /> uprights. Stringers are sometimes called whalers. <br /> - a structural member designed to resist forces, either tensional or compressional. <br /> larch- an excavation made below the surface of the ground. In general, the depth is <br /> greater that the width at the bottom, but the width of a trench at the bottom is not greater <br /> than 15 feet. <br /> Trench Shield - a protective device which shields workers from the effect of ground <br /> movement and which can be moved along as work progresses. <br /> Uprights - the vertical members of the shoring system. <br /> MMer - a structural member in a horizontal or nearly horizontal position used for <br /> stiffening or securing other components of concrete forms, excavation sheeting, or similar <br /> temporary structures. <br /> EXCAVATION PROCEDURES <br /> (also trenches, shafts, and other earthwork) <br /> 1. Prior to beginning an excavation, the location of all underground utilities and other <br /> underground hazards shall be determined. <br /> 2. A hazard assessment shall be conducted by a qualified person to evaluate the <br /> potential exposure to employees who may work in or around the excavation. <br /> 3. The excavation shall also be inspected by a qualified person after each rain or <br /> other hazard-increasing event to evaluate the potential hazards from slides or cave- <br /> ins. <br /> 4. Anytime an employee enters an excavation 5 feet or greater in depth, that <br /> employee must be protected by a system of shoring, sloping, benching, or <br /> attemative means addressed in #15 below. <br /> 5. The conditions in #4 above, will also require Groundwater Technology to obtain <br /> the necessary excavation permit and/or notification procedures with Cal-OSHA. <br /> �. Fx&TRNCH.POL/MG #2 <br /> err <br />
The URL can be used to link to this page
Your browser does not support the video tag.