Laserfiche WebLink
Gealogieal7"eckrucs lrcc. �'"" <br /> Tann;Closure Investigation <br /> Project No. 1218.2 <br /> June 13, 2005 <br /> 2.1 GeoProbe Survey <br /> Three GeoProbe boreholes are proposed for the site. They will be located as proposed on the <br /> �. Site Map, Figure 2 (GP-1, GP-2 & GP-3). Final locations of the borings may be adjusted in <br /> the field based on field indications of underground utilities. <br /> The borehole will be drilled with a GeoProbe rig owned and operated by V&W Drilling, a <br /> licensed drilling contractor. The GeoProbe advances a coring tool with a pneumatic hammer <br /> to a selected depth. Upon reaching that depth the coring tool is opened and advanced further <br /> to fill the core barrel. The soil sample enters an acetate cylinder contained in the coring tool. <br /> Upon filling, the coring tool is pulled from the hole and the cylinder is removed. The <br /> cylinder is then cut and the selected interval is capped with Teflon foil and plastic end caps <br /> and placed on ice for shipment to the laboratory. The remainder is used for geologic logging. <br /> The GeoProbe borings will be advanced to a total depth of 20 feet bgs. With the GeoProbe it <br /> is just as easy to continuous core as it is to core from selected intervals. Up to two samples <br /> from each borehole will be submitted to the laboratory for analysis. <br /> 2.1.1 Soil Laboratory Analyses <br /> Up to two soil samples from each borehole will be submitted to a state certified laboratory for <br /> the following analysis: <br /> - • Benzene, toluene, ethyl benzene and xylene (BTEX) by EPA method 8260B <br /> a Gasoline range petroleum hydrocarbons (TPH-G) by EPA method 8015m <br /> • Diesel range petroleum hydrocarbons (TEPH-D) by EPA method 8015m <br /> • Oxygenated fuel compounds (OFCs) by EPA method 8260B <br /> The detection limits for these compounds are listed below. A Chain of Custody will be <br /> completed for all samples collected and tracked to ensure sample integrity. <br /> Detection Limits: BTEX OFCs* TPH-G TEPH-D Total Lead <br /> Soil ( K ) 3.0 50 1,000 1,000 1,000 <br /> *=standard 5 oxygenated fuel compounds,plus EDB &DCA <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after work <br /> plan approval and issuance of the drilling permit. The information gathered during this phase <br /> of work will be presented in a report, which will include a summary of the geology as well as <br /> the results of sample analyses. The project will be supervised by Dr. Ray Kablanow, a <br /> registered professional geologist. Copies of the report will be forwarded to both the <br /> appropriate County and State regulatory agencies. <br />