My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1610
>
2900 - Site Mitigation Program
>
PR0524303
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 3:39:21 PM
Creation date
2/11/2019 2:53:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524303
PE
2950
FACILITY_ID
FA0016297
FACILITY_NAME
ARMOUR & BONNIE SMITH 2003 TRUST
STREET_NUMBER
1610
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14325008
CURRENT_STATUS
01
SITE_LOCATION
1610 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„,' CrealogicalTarluiies lnc. %.e Page 2 <br /> Site Characterization Work Plan <br /> Elving(Broadway) <br /> Project No. 1218.2 <br /> September 26,2005 <br /> 2.0 PROPOSED INVESTIGATION <br /> To further investigate the extent of soil impacted with petroleum contaminants, GTI proposes <br /> to advance six (6) direct push boreholes (SB-1 through SB-6), collect soil samples, and <br /> analyze these samples for petroleum hydrocarbon compounds. <br /> L, The proposed locations of the boreholes are designated SBA through SB-6 in Figure 2. The <br /> locations are intended to define the extent of the soil plume that is centered on the UST and <br /> dispenser island.. The actual location of the probes will be selected in the field, as numerous <br /> utility lines exist below ground surface at the site. <br /> 2.1 Direct Push Borehole Survey <br /> Soil Core Sampling <br /> Six Direct Push boreholes will be advanced as indicated in Figure 2 to a maximum depth of <br /> r.., 40 feet below grade surface. Soil samples will be continuously collected to total depth. <br /> The boreholes will be drilled with an AMS PowerProbe DPT/HSA rig owned and operated <br /> �. by Resonant Sonic International of Woodland, CA. The PowerProbe advances a coring tool <br /> with a pneumatic hammer to a selected depth. Upon reaching that depth the coring tool is <br /> opened and advanced further to fill the core barrel. The soil sample enters an acetate cylinder <br /> �. contained in the coring tool. Upon filling, the coring tool is pulled from the hole and the <br /> cylinder is removed. The cylinder is then cut and the selected interval is capped with Teflon <br /> end caps and placed on ice for shipment to the laboratory. The remainder is used for geologic <br /> *. logging. <br /> The PowerProbe rig has the advantage that if direct push conditions meet refusal, then the rig <br /> �. can be converted to hollow stem auger operation. This method will be used as necessary. <br /> Up to three soil samples per borehole location will be submitted to the laboratory for <br /> �. analysis, with the capillary fringe soil sample from each borehole analyzed as a minimum (if <br /> encountered). . <br /> �- After the terminal depth is reached the boreholes will be closed with a neat cement grout <br /> containing less then 4% bentonite. <br /> 2.2 Soil Laboratory Analyses <br /> Up to 18 soil samples will be submitted to a state certified laboratory for analysis for: <br /> �-” • Benzene, toluene, ethylbenzene and xylene (BTEX) by EPA method 8020. <br /> • Gasoline range petroleum hydrocarbons (TPH-G) by EPA method 5030/8015(m). <br /> L . <br /> 4.. <br /> f.r <br />
The URL can be used to link to this page
Your browser does not support the video tag.