My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROOK HOLLOW
>
6331
>
2900 - Site Mitigation Program
>
PR0526755
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 4:19:41 PM
Creation date
2/11/2019 3:39:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526755
PE
2950
FACILITY_ID
FA0018115
FACILITY_NAME
BROOKSIDE ASSOCIATION
STREET_NUMBER
6331
STREET_NAME
BROOK HOLLOW
STREET_TYPE
CIR
City
STOCKTON
Zip
95219
APN
11637026
CURRENT_STATUS
01
SITE_LOCATION
6331 BROOK HOLLOW CIR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field Investigation Work Pla <br /> Brookside Estates, Stockton, California 1/9/07 Sert Consulting, Inc. <br /> ' TABLE OF CONTENTS <br /> 1.0 INTRODUCTION............................................................................................................. 1 <br /> 1.1 Background............................................................................................................. 1 <br /> 1.2 Description of Site Conditions and Locations........................................................ 1 <br /> 1.3 Investigation Objectives.......................................................................................... 2 <br /> ' 2.0 GEOTECHNICAL SAMPLING PLAN <br /> 2.1 Drilling Equipment and Methods............................................................................ 2 <br /> ' 2.2 Soil Sampling.... <br /> 2.3 Grab Groundwater Sampling.................................................................................. 3 <br /> 2.4 Groundwater Sampling Methods............................................................................ 3 <br /> ' 2.5 Water Level Measurements ....................................................... <br /> 2.6 Field Quality Control Measures.............................................................................. 3 <br /> ' 2.7 Equipment Decontamination................................................................................... 3 <br /> 2.8 Investigation Derived Waste................................................................................... 3 <br /> 3.0 PROPOSED SOIL AND GROUNDWATER ANALYTICAL TESTING.................. 4 <br /> ' 3.1 Soil Testing Approach .............. <br /> ................................................ 4 <br /> 3.2 Groundwater Testing Approach.............................................................................. 4 <br /> 4.0 QUALITY ASSURANCE OVERVIEW......................................................................... 4 <br /> 4.1 Certification ............................................................................................................ 4 <br /> 4.2 Sample Handling..................................................................................................... 5 <br /> 4.2.1 Required Materials ..................................................................................... 5 <br /> 4.2.2 Sample Containers...................................................................................... 5 <br /> 4.2.3 Sample Preservation and Filtering Procedures.......................................... 5 <br /> ' 4.2.4 Sample and Location Naming Convention.................................................. 6 <br /> 4.2.5 Sample Labeling Procedures...................................................................... 6 <br /> ' 4.2.6 Chain-of-Custody Procedures..................................................................... 6 <br /> 4.3 Field Quality Control Samples................................................................................ 6 <br /> 5.0 SCHEDULE....................................................................................................................... 6 <br /> ' LIST OF FIGURES <br /> 1 Location Map <br /> 2 Brook Hollow Sampling Locations <br /> 3 Nostalgia Sampling Locations <br /> 4 Poppy Hills Sampling Locations <br /> 5 Spyglass Sampling Locations <br /> 6 Anticipated Boring and Completion Schematic <br /> ' APPENDIX A Site Health and Safety Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.