Laserfiche WebLink
sem. <br /> Case Closure Summary Page i12 <br /> Legg Underground Fuel Storage Tank ProgrU <br /> III Release and Site Characterization Information continued <br /> Maximum Documented Contaminant Concentrations -- Before and After Clir <br /> eanup <br /> Contaminant Soil Before Soil Water Water Contaminant soil Soil Water Water <br /> 11(ppm) After Before After Before After Before After <br /> (Ppm) r (0'P' (ppm) <br /> <002 <br /> TPH(Gas) 1,900 41.0 30.6 <.050 MTBE <0.5 <0.005 .0125 ---- <br /> Benzene 0.075 <0.005 .02 <.0005 Lead 40.5 15 <br /> Toluene 7.3 <0.005 1.4 <.0005 EDB 0:0041 4.002 <br /> Ethylbenzene 18 <0.005 .484 4.0005 1,2-DCA ' w'k ____ ---- 4.002 <br /> Xylene 120 <0.005 6.06 <.0005 TEPH i 5000 <br /> I <br /> k <br /> I� <br /> "Soil Before" levels are from MW1 at 10.5 feet in February 1999, except TEPH which is diesel contamination in the soil <br /> sample collected at 3 feet along the fill line at the time of the tank pull in 1990. "Water Before" levels are from August 1997 <br /> grab water sample from a boring, except MTBE which is from MW 1 in February11999. "Soil After"levels are from the <br /> monitoring wells installed in February 2001. "Water After" levels are from jthe monitoring wells on 3/4/02. <br /> i Results of soil samples from subsequent investigations of the both diesel UST and the remote fill line in August 1997 <br /> were all <br /> no : <br /> detect. <br /> Only MW-1 groundwater samples had minor levels of BTEX contamination between 1999 and 2000. Results of <br /> groundwater samples from all five wells have fallen to non-detect levels over the`last 4 quarterly monitoring events in 2001 <br /> and 2002. Investigation showed minimal impact to soil and groundwater. Beneficial uses of groundwater are protected, now <br /> and in the future. <br /> IV. Closure i <br /> Does completed corrective action protect existing beneficial uses per the,Regional Board Basin Plan? Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Yes <br /> ,p <br /> Site management requirements: none I <br /> Should corrective action be reviewed if land use changes? Yes <br /> Monitoring wells decommissioned: No Number Decommissioned: 0 Number retained: 5 <br /> List enforcement actions taken: NOR sent : <br /> List enforcement actions rescinded: None P ` <br /> V. Local Agency Representative Data ' <br /> � ilE <br /> Name: Margaret Lagorio Title: Supervising REHS/Site Mitigation/LOP Unit IV <br /> Signature: Date: p <br /> ;l <br /> VI. Central Valley Regional Water Quality Control Board (RB) Notification <br /> - <br /> Date Submitted to RB: November 6, 2002 Response Date: <br /> 1 RB Staff: Marty Hartzell Response: <br /> I <br /> Title: Assoc Eng Geologist i <br /> VII. Additional Comments,Data, etc. <br /> -g - <br /> Destruction of MW-1 to MW-5 must occur prior to final closure. <br /> This document and the related CASE CLOSURE LETTER,Shall be retained by the lead agency as part of the <br /> official site file. (08/24/93) Exhibit N Page 2 of 2 I` <br />