Laserfiche WebLink
. 2 Topography, geology, Surface water, depth to groundwater : <br /> The site is situated on lev��l terrain .ad��c.ent the S,ar, ioaquin <br /> River and Buckley Cove and is comprised of dredged material . The <br /> water table within the shallow sediments fluctuates with River <br /> levels and tides, but is generally within ten feet of the <br /> surface . The -3roundwater is believed to flow north with the Sian <br /> Joaquin River . <br /> 2 . 9 Proximity of private, municipal and irrigation wells ; <br /> The Buckley Cove development water supply comes from a domestic <br /> we1:1 lacated approximately a quarter mile south of the site. <br /> Vhts is.-- a_so the closest well . <br /> 2 . 10 Locations of nearby septic tanks and underground utilities : <br /> Septic tanks within a quarter mile of the site are in use for <br /> development . Utility locations will be determin�_d prior to <br /> initiating any subsurface exploration . <br /> 2 . 11 Distance to adjacent buildings and their water/sewer lines : <br /> r <br /> The club house and office are the nearest buildings as indicated <br /> on Figure 2 . Utility laterals will be determined prior to <br /> initiating any subsurface exploration . <br /> t:.a <br /> 2. 1.2 Proposed sampling locations and methodology: <br /> To assess the contribution of farmer underground tanks on the <br /> stephen5 Anchorage property to the present groundwater <br /> i ha contamination, WaterWork proposes to dtJ 11 and sample three <br /> groundwater monitoring wells, an,i several shallow soil borings, <br /> ITA if necessary. <br /> r The following scope of work is proposed: <br /> 1 . Three soil borings will be advanced to a depth of 15 feet <br /> below the water table to provide for the installation of <br /> groundwater monitoring wells . Drilling will be conducted under a <br /> C57 license, using a hollow stem auger drill rig. The proposed <br /> well locations, presented on Figure 2, include one well <br /> upgradient of the tank pit, and two wells down groundwater <br /> i & gradient from the former tank location . The wells will be <br /> constructed of two inch diameter F480 PVC well screen/casing and <br /> completed as shown on Figure 3 . to addition, shallow soil <br /> borings ( 4 foot maximum depth) may be drilled to assess the <br /> s extent of near surface soil contamination. The soil borings <br /> would be abandoned by filling with cement grout . <br />