Laserfiche WebLink
Section 6.0 , <br /> Construction Phase <br /> As described above,there are several challenges,such as grouting, seepage,and <br /> settlement of existing structures, associated with the construction of the temporary <br /> excavation support. Therefore,we recommend that CDM review the contractor's <br /> shoring submittals. We also recommend that CDM be retained to provide <br /> construction monitoring services during the geotechnical phases of construction. This <br /> will allow us to verify subsurface conditions are as expected,and to observe the <br /> contractor's work as the owner's representative. <br /> y <br /> l <br /> t CDM c..,p Mdc-hr- 6-1 <br /> G:t250=9248-GEo-TaRepo"ruok5itle Pump Stalion.tloc <br />