Laserfiche WebLink
rt <br /> ODM Cam resser& <br /> p DMcKee Inc. <br /> Mr. Amin Kazimi <br /> March 30, 2001 .r <br /> Page 3 W <br /> stabilized.,The grab groundwater sample will be collected rising a disposable Teflon w• <br /> bailer. A new pair of latex gloves will be worn'during saFnple collection. The sample will , <br /> be retained in one 500-m1 un-preserved plastic container and one 100-m1 plastic sterile <br /> container. The sample will be stored in a cooler with ice until submittal to the laboratory-. <br /> The sample will be analyzed for pH, fecal coliform, and_ chrozxiium VI by an outside <br /> laboratory. <br /> 4.0 Waste Disposal, <br /> Soil cuttings extracted from borings B1 and B2 will be stockpiled on-site and covered with <br /> plastic. The owner will dispose of the soil cuttings after testing is complete: <br /> Groundwater discharged from the piezometer during.development and purging will be <br /> contained in a 55-gallon drum and later disposed of on-site pending the analytical results« <br /> of groundwater sample.F <br /> Thank you for the opportunity to assist the City of.Stockton on this project:-f-Please- <br /> contact Michael G. Gray at (925) 933-2900 if you have ariy questions or comments <br /> regarding this Work Plan. •. <br /> Very truly yours, <br /> CAMP DRESSER &MCKEE INC. " <br /> Michael G. Gray, C.E.G. <br /> Principal <br /> Attachments: <br /> E Figure 1 Site Location Map � h <br /> a" Figure 2 Boring Location Map <br /> Figure 3^Well Construction Detail <br /> I <br /> T <br /> E <br /> .N:\Proj315TOCKTQN\Brookside PumpNworkplan032901-doc <br /> J <br />