My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROOKSIDE
>
0
>
2900 - Site Mitigation Program
>
PR0516793
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 9:04:27 AM
Creation date
2/12/2019 8:55:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516793
PE
2950
FACILITY_ID
FA0012808
FACILITY_NAME
CITY OF STOCKTON-MUD
STREET_NUMBER
0
STREET_NAME
BROOKSIDE
STREET_TYPE
RD
City
STOCKTON
Zip
95207
CURRENT_STATUS
02
SITE_LOCATION
BROOKSIDE RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> HEALTH AND SAFETY PLAN FORM This document is for the exclusive use CAMP DRESSER & McKEE INC. <br /> of CDM and its subcontractors <br /> CDM Health and Safety Program <br /> PROJECT NAME: Brookside Pump Station WORK ASSIGNMENT #: <br /> REGION: WST <br /> JOB SITE ADDRESS: Bounded by Interstate-5 to the east and CLIENT: City of Stockton <br /> Brookside Road and the Calaveras River to the south, in <br /> Stockton , California <br /> PROJECT: 2500-29248-GEOT.TI <br /> CLIENT CONTACT: Amin Kazimi CDM CONTACT: Michael G. Gray <br /> PHONE : 209-937-8322 PHONE : 925-933-2900 <br /> AMENDMENT #: <br /> ( ) AMENDMENT TO EXISTING APPROVED HSP ( X ) DATE EXISTING APPROVED HSP <br /> OBJECTIVES: Summarize below <br /> Advancement of two soil borings, installation of one piezometer and collection of soil and <br /> groundwater samples . <br /> Type: Check as many as applicable <br /> ( X) Active ( ) Landfill ( ) Unknown <br /> ( ) Inactive ( ) Uncontrolled ( ) Military <br /> ( X) Secure ( ) Industrial ( ) Highway <br /> ( ) Unsecure ( ) Recovery ( ) Dept. Yard <br /> ( } Enclosed space { ) Well Field ( ) Other : specify <br /> DESCRIPTIONS AND FEATURES : Summarize below. Include principal operations and unusual features (containers, <br /> buildings, dikes, power line, terrain, etc.) <br /> The Brookside Pump Station is a sewer lift station for the City of Stockton ' s sanitary sewer system. The site <br /> consists of a masonry building in a fenced in compound . The site is bound on the east by Interstate 5. <br /> Brookside Road and the Calaveras River form the south boundary of the site. <br /> SURROUNDING POPULATION : <br /> ( ) Residential ( X ) Industrial ( ) Commercial ( ) Rural ( ) Urban ( } Other <br /> All requirements described in the CDM Health and Safety Assurance Manual for Hazardous Operations are <br /> incorporated into this Health and Safety Plan by reference. <br /> N;1Proj31STOCKTON%Brookside Pump\HASPBrcokside Pump,doc Page 1 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.