My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUSINESS LOOP 205
>
5157
>
3500 - Local Oversight Program
>
PR0544135
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 10:07:01 AM
Creation date
2/12/2019 10:02:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544135
PE
3528
FACILITY_ID
FA0005488
FACILITY_NAME
STRONG, RUTH
STREET_NUMBER
5157
Direction
W
STREET_NAME
BUSINESS LOOP 205
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
5157 W BUSINESS LOOP 205
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;w <br /> Monitoring Well Installation Work Planl- September 2008 <br /> STRONG PROPERTY <br /> 5157 West Business Loop 205, Tracy,l California <br /> 1.0. INTRODUCTION <br /> At the request of Messrs. Robert and Mike Strong,Advanced GcoEnvironmental, Inc (AGE) has <br /> prepared this Monitoring Well Installation Work Plan-September 2008 for the site located at 5157 <br /> West Business Loop 205, Tracy, California(site). The site and the surrounding area are illustrated <br /> in Figure 1. Structures and monitoring well locations are illustrated on Figure 2. Quarterly <br />+ monitoring data from July 1998 to the present are summarized in Tables 1 through 3 of this report. <br /> r Site background information is included in Appendix A. <br /> The San Joaquin County Environmental Health Department(E 6)has directed,by letter dated 28 <br /> July 2008, preparation of a work plan to further investigate the vertical extent of petroleum <br /> hydrocarbon-impacted groundwater at the site and to verify ground water analytical results collected <br /> from the November 2007 cone penetrometer testing (CPT) investigation. <br /> I <br /> This work plan provides a description of the scope of work and pi ocedui es for the installation of two <br /> depth discreet ground water monitoring wells, collection of soil`samples,collection and analysis of <br /> ground water samples.The plan was prepared in accordance with,California Regional Water Quality <br /> Control Board-Central Valley Region(CRWQCB)guidelines for the 'investigation of underground <br /> storage tank(UST) sites. <br /> F <br /> 2.0. SCOPE OF WORK <br /> E <br /> I <br /> Based on the analytical data acquired from the November 2007 CPT':investigation (Table 4), the <br /> t SJCEHD has required an additional ground water investigation be performed to define the vertical <br /> extent of the petroleum hydrocarbon contamination. <br /> The proposed scope of work will include the following tasks: <br /> Permitting and pre-field work activities; <br /> • Monitoring well installations and sampling; and <br /> • Report preparation. <br /> Each of these tasks is described in greater detail below. <br /> I <br /> Advanced GeoEnvironmentai,Inc. <br /> i <br /> i <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.