Laserfiche WebLink
APR-28-94 THU 17:01 CONDOR EARTH TECH FAX NO. 2095320773 r. uq <br /> WORK PLAN <br /> 4 <br /> POTENTIALLY CONTAMINATED SOILS <br /> AT THE <br /> 1;L RANCHO ROCK & SAND, INC. QUARRY <br /> SITE. RECLAMATION <br /> 1.0 INTRODUCTION <br /> The EI Rancho Rock & Sand, Inc. Quarry, a small sand and travel processing facility at 8020 <br /> Waverly Road in Linden, began operations sortie time prior to 1981 as "Linden Aggregates" <br /> andlor "Linden Sand and Caravel". .In 1981, the property was issued Use Permit EP-81-9 for <br /> a 67.1 acre quarry site. In 1991, EI Rancho Rock & Sand, Inc, was issued CLIP QX-91-6 for <br /> an expanded quarrying operation which encompassed the entire =180-acre site. Processing <br /> operations at the plane ceased in September of 1993, before the permitted resources were <br /> completely quarried. The plaint processing equipment was dismantled and removed from the site <br /> in December of 1993. The operation is now unofficially classified as "idle", or "inactive", and <br /> the approved Reclamation Plan is being implemented by Condor under the direction of the San <br /> Joaquin County Community Development Department. The site location is illustrated as Fibure <br /> 1, Location Map. Figure 2, Site Plan, summarizes the site features relevant to the reclamation <br /> operation currently in progress. <br /> The Work Pian titled "Winter Stabilization Plan, Phase I of Reclamation", was submitted to the <br /> San Joaquin County Community Development Department, Development Services Division for <br /> their review and approval on March 3, 1994. Following discussions with Iver. Tom Gau, Senior <br /> Civil Engineer, the revised Work Plan was submitted on March 10, 199¢, The drawings <br /> included in the Phase. 1 Reclamation Work Flan are attached in Appendix II. The Phase I work <br /> was started on April 11, 1994. <br /> implementation of the approved Reclamation Plan will require earthmoving, grading, and <br /> recontounng activities, as well as the demolishing and removal of mass and reinforcers concrete, <br /> It is anticipated that areas of potential contamination may be encountered in the near-surface and <br /> subsurface soil materials beneath or near the plant facility as well as in other areas of the site. <br /> This Work Plan has been prepared to describe the procedures for addressing the potential <br /> contamination. <br /> 2.0 STATEMENT OF THE PROBLEM <br /> Potent-at contaminants could be encountered at the prgject site as follows- <br /> Type 1 ConIgmination. Tblh Te may be areas of potentially contaminated soils in or <br /> beneath the area of the recent plant facility. These pots ntially contaminated soils could <br /> be present at the existing ground surface, or could be in the subsurface, originating when <br /> the plant was lea another, ,much earlier conftpuration. Potential contaminants could <br /> include, but are not necessarily limited to; petroleum hydrocarbon products such as <br /> Ir1 couno� <br />