My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2003 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:40:16 PM
Creation date
2/13/2019 2:56:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2009
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by <> <br /> BP West Coast Products LLC <br /> 4 Centerpointe Drive <br /> La Palma,CA 90623 <br /> December 17, 2004 DEC 2 9 2004 <br /> Designated UST Operator Program ENVIRONMENT HEALTH <br /> County of San Joaquin <br /> PERMIT/SERVICES <br /> Environmental Health Division <br /> 304 E. Weber Ave., 3`d Floor <br /> Stockton, CA 95202 <br /> Re: ARCO Facility Number 06100 <br /> 25775 S. Patterson Pass <br /> Tracy, CA 95376 <br /> On behalf of BP West Coast Products LLC (BP), the owner of the underground storage <br /> tanks (USTs) at the subject facility, I hereby make the following representations. BP <br /> understands the underground storage tank (UST) requirements applicable to the subject <br /> facility. I have personally reviewed the results of the following: <br /> • Monitor Certification conducted December 7, 2004 <br /> • Compliance Survey conducted November 22, 2004 <br /> • Closure of issues identified by the Compliance November 29, 2004 <br /> Based on that review I believe that BP was in compliance with the applicable UST <br /> requirements on December 14, 2004. Furthermore, I am unaware of any information <br /> that would cause me to believe that such statement is no longer appropriate. <br /> BP will supplement this statement by January 1, 2005 with the name of the designated <br /> UST operator for this facility. <br /> Sin erely, <br /> Jo Schetter SA <br /> E ronmental Compliance Specialist <br /> BP West Coast Products LLC <br /> Compliance &Assurance <br />
The URL can be used to link to this page
Your browser does not support the video tag.