My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
0
>
2900 - Site Mitigation Program
>
PR0506226
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 9:41:03 AM
Creation date
2/14/2019 9:17:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506226
PE
2953
FACILITY_ID
FA0007288
FACILITY_NAME
MONTEROSSO PARCEL
STREET_NUMBER
0
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
CORRAL HOLLOW RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> y <br /> LEVINE•FRICKE <br /> 4.0 SCHEDULE <br /> 'I <br /> Levine•Fricke can initiate the permit acquisition process within <br /> one week of receiving authorizationito proceed from Sunboro. <br /> Based upon our experience with the SJLHD, we anticipate that it <br /> will take two to three weeks to obtain a permit necessary to <br /> begin the field work. After beginning field work, we can obtain <br /> laboratory results in about three weeks. We anticipate that <br /> report can be submitted to Sunboro in three to four weeks after <br /> our receiving laboratory data; however, the results and <br /> alternatives can be discussed verbally with Sunboro once <br /> laboratory data are received. Thislschedule is contingent upon <br /> subcontractor availability, and precludes conditions beyond our <br /> control that would prohibit our completing work as scheduled. <br /> 5.0 ESTIMATED BUDGET <br /> Levine•Fricke will provide serviceslon a time-and-materials <br /> basis, calculated in accordance with our current Schedule of <br /> Charges (attached) . The time and expenses required for each task <br /> are based upon the level of effort deemed necessary, according to <br /> our experience. A fifteen percent (15%) charge will be added for <br /> all subcontractor fees and incurred expenses to cover <br /> Levine•Fricke's insurance and handling costs. The estimated <br /> budget will not be exceeded withoutlprior authorization from <br /> Sunboro. <br /> Task 1: Permit Acquisition <br /> Levine•Fricke Staff $ 800 <br /> SJLHD Permit (with accelerated review) 175 <br /> SJLHD Field Inspection Charges 210 <br /> Subcontract Administration (15%) 58 <br /> Estimated Task 1 Total $ 1, 243 <br /> Task 2 : Well Installation <br /> (four approx. 20-foot deep wells) <br /> Drilling Subcontractor (20 hrs I@ $130/hr) $ 2, 600 <br /> Steam Cleaner and Generator 600 <br /> Well materials 1,200 <br /> Levine•Fricke Staff 2,800 <br /> Equipment Rental 200 <br /> Travel, Expenses 125 <br /> Subcontract Administration (15%) 615 <br /> Estimated Task 2 Total $ 8, 140 <br /> -4- <br />