Public Notification—Generforder No. R5-20034044 w • <br /> Mountain House Creek Restoration Project, Mountain House, California July 6,2004 <br /> According to construction plans provided by Trimark Communities(Trimark), Byron Road will <br /> be reconstructed into a six-lane throughfare and railroad line with a bridge crossing over a <br /> widened Mountain House Creek. The proposed bridge crossing will require spread footings to an <br /> approximate depth of 23 feet below ground surface(bgs)that span the width of the proposed <br /> Byron Road ROW and Union Pacific Railroad ROW. As part of Trimark's development plans, <br /> the proposed Mountain House Creek will be widened into a greenbelt area to an approximate <br /> width of 300 feet and deepened to an approximate depth of 15 feet bgs. Due to Trimark's <br /> development plans, SAIC on behalf of ChevronTexaco conducted a soil and groundwater <br /> investigation of the proposed excavation areas. Petroleum-affected soil and separate-phase oil <br /> (SPO)were encountered in the vicinity of the existing Mountain House Creek at depths ranging <br /> between approximately 6 and 40 feet bgs. Thus it is likely that during the proposed excavation of <br /> the bridge footings and dewatering of the subsurface, SPO and petroleum-affected soil and <br /> groundwater will be encountered. Therefore, on behalf of ChevronTexaco, SAIC designed a <br /> groundwater treatment system for this project. <br /> SAIC in conjunction with Calgon Carbon Corporation (Calgon)of Richmond, California,will <br /> provide, operate,and maintain the groundwater treatment system. The groundwater extraction, <br /> treatment, and disposal system for the Mountain House Creek Restoration Project and bridge <br /> construction will consist of three separate processes. Teichert Construction (Teichert), on behalf <br /> of Trimark Communities, LLC, will be responsible for the dewatering well construction and <br /> extraction,transferring the groundwater to the treatment system and conveying the treated <br /> groundwater for disposal by land application. Disposal of treated groundwater will be in <br /> accordance with the requirements of Order No. R5-2003-0044, General Order for Land Disposal <br /> of Groundwater or Surface Water from Cleanup of Petroleum Pollution, California Regional <br /> Water Quality Control Board, Central Valley Region (the Order). <br /> Teichert will install up to 18 groundwater extraction wells to a total depth of approximately 40 <br /> feet bgs in the general vicinity of the proposed road and bridge construction activities. <br /> Submersible pumps, capable of withdrawing groundwater at a rate of 25 gallons per minute <br /> (gpm), will be installed in the dewatering wells to facilitate the dewatering activities and to lift <br /> the water to the treatment system. The number of groundwater extraction wells may decrease <br /> over the life of the project as the site subsurface is dewatered and the project progresses. <br /> The groundwater treatment system consists of six 20,000-gallon open-top holding tanks that have <br /> the ability to be plumbed in series or parallel depending on the quantity of SPO that is <br /> encountered. The SPO will be removed from the process stream using disposable absorbent <br /> booms and pads installed in the holding tanks. The absorbent will be replaced as needed during <br /> treatment operations. <br /> The holding tanks will also be used as settling basins to remove the suspended solids from the <br /> process stream. Groundwater will then be transferred between holding tanks using piping <br /> installed near the bottoms of the tanks. This underflow piping will assist in minimizing SPO <br /> from entering the treatment train. Groundwater influent samples will also be collected for <br /> chemical analyses at the final holding tank. Groundwater will be transferred from the final <br /> holding tank for treatment using a 500-gpm diesel-powered transfer pump. <br /> A trailer-mounted duplex cartridge filter pre-treatment system is located downstream of the <br /> transfer pump. The cartridge filter system consists of eight 10-micron mesh filter units, and will <br /> be used to remove any remaining suspended solids from entering the granular activated carbon <br /> (GAC)treatment system. The filter cartridges will be replaced as needed during system operation <br /> and maintenance activities. Suspended solids removed by filtering or settling will be disposed of <br /> in accordance with Section D of the Order. A mechanical flow indicator and totalizer is located <br /> downstream of the cartridge filter system and upstream of the GAC treatment system. <br />