nmployee Owned Company <br /> Stage 2. <br /> During the second stage, the soil borings will be drilled on Union Pacific <br /> Railroad right of way: near the railroad tracks and on adjacent Trimark <br /> property (APN # 209-040-09). Our client, ChevronTexaco finalized the <br /> access agreement with Union Pacific Railroad, and a copy of this <br /> agreement is attached. <br /> Attached with this letter please find all the documents required to perform <br /> drilling in the Second Stage at Union Pacific Railroad right of way and on <br /> adjacent Trimark property north of West Byron Road (APN#209-040-09). <br /> SAIC would appreciate it greatly if you could please review and approve the <br /> applications at a suitable time. SAIC has tentatively scheduled a start date <br /> for Stage #1 for April 19, 2004 and since we have all required access <br /> agreements for Stage #2 we would like to continue with the Stage #2 <br /> immediately after completion of Stage # 1. <br /> If you have any questions or comments, or if you require additional <br /> information please contact Todd Del Frate at 916-9793741 , or Lee Ignatowicz <br /> at 916 -979-3743. <br /> Sincerely, <br /> ;1 <br /> 11natowicz Lee <br /> Proj Geoscientist <br /> SAIC Sacramento Div. 6102 <br /> 3800 Watt Ave., Suite 210 <br /> Sacramento, CA 95821 <br /> Telephone: 916 — 979 — 3743 <br /> Fax: 916 — 979 — 3735 <br /> Email: IGNATOWICZZ@SAIC.COM <br /> Attachments: <br />