ChevronTexaco - 2 - 26 March 2004 <br /> Mountain House Sites #1 and #2 <br /> The Addendum proposes the following: <br /> • Advance 22 additional borings and collect soil and groundwater samples at Site# 1 in the area of <br /> Mountain House Creek to be altered. The total number of borings will be 32, including the 10 <br /> originally proposed. <br /> • Two additional borings will be placed at Site #2 to collect soil and groundwater samples, slightly <br /> northwest of the proposed bridge. The total number of borings will be 12, including the 10 <br /> originally proposed. <br /> I have the following comments: <br /> • ChevronTexaco and Regional Board staff, to expedite the characterization process during the <br /> course of the investigation work, should collectively review the results of analyses and held <br /> observations to determine any need for additional borings, and/or sampling locations. <br /> • Representative groundwater samples from a portion of the borings need to be collected and <br /> analyzed for general minerals and nitrate. <br /> I concur with the 12 March 2004 Workplan Addendum for the additional borings at Mountain House <br /> Sites # 1 and# 2,provided the comments discussed above are addressed. <br /> Proposed Streambed Alteration and Bridge Construction <br /> Based on the imminent bridge construction and streambed alterations currently proposed, I believe that it is <br /> appropriate to address the potential environmental/permitting issues that may be encountered during <br /> construction activities. The conditions are similar to those seen during the ChevronTexaco and the City of <br /> Tracy's recent Westside Channel Outfall System project where petroleum hydrocarbon-impacted soil and <br /> groundwater associated with the OVP was encountered. ChevronTexaco continues to be the responsible <br /> party for soil and groundwater issues relating to impacts from the OVP such as could be encountered <br /> during these projects. <br /> Mountain House Creek flows southwest to northeast, generally separating Sites# 1 and #2, and crossing <br /> beneath Byron Road and the UPRR tracks. According to the Addendum, following completion of the <br /> proposed borings, the streambed will be deepened and widened, in part to accommodate the proposed <br /> Byron Road bridge construction project, but also as part of the Mountain House Creek Restoration Project. <br /> The existing bridge and UPRR crossings will be replaced by a new approximately 80 by 240 foot bridge <br /> over the creek. The additional drilling work described above is to investigate those portions of the property <br /> that would be affected by the bridge construction and streambed alteration. <br />