My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
0
>
2900 - Site Mitigation Program
>
PR0516739
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 10:33:08 AM
Creation date
2/14/2019 10:27:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516739
PE
2950
FACILITY_ID
FA0012765
FACILITY_NAME
GLEASON PARK PROPERTIES
STREET_NUMBER
0
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
CALIFORNIA ST
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> City of Stockton Redevelopment Agency B34604.01 c <br /> June 1, 2001 Page 2 <br /> 328 California Street: <br /> Additional soil samples will be collected adjacent to sample HA-7 and to the north,south,and west <br /> of sample HA-7 at 1, 5, 10, and 15 feet BSG if possible due to restricting site conditions inside the <br /> structure(see Drawing 2). These soil sam les identified as HA-15,HA-16,HA-17,HA-18,and HA- <br /> 19 will be analyzed for Total Lead. (Note: If elevated concentrations of lead are detected in the <br /> samples a Waste Extraction Test will be run on the sample. <br /> The soil samples HA-15,HA-16, and FD L-19 located within the on-site structure will be collected <br /> by first hand-augering to the selected depi h and then driving a pre-cleaned stainless steel sleeve into <br /> the target depth. The two samples HA-1 and HA-18 located outside of the structure will be drilled <br /> using a hollow-stem auger portable drib i ig. Sample HA-17 will be angled in order to collect a soil <br /> sample at 10 and 15 feet BSG from beneath the "dip tanks", and sample HA-18 will be drilled <br /> vertically to the north of HA-17. Samp es will be sealed with Teflon tape and plastic end caps, <br /> labeled, placed on ice, and delivered to a state certified laboratory, along with chain-of-custody <br /> documentation. <br /> The information obtained from this additipnal sampling will be combined with the information from <br /> the original sampling during the Phase II investigation to assess the vertical and lateral extent of lead <br /> impacted soil detected in sample HA-7 d ring the Phase II Investigation. <br /> Following the completion of the sampling all borings will be backfilled with either neat cement or <br /> hydrated bentonite chips to within 1 foot of the surface, and then completed to match existing site <br /> conditions. All soil cuttings will be stored in 55-gallon drums labeled and stored on-site in a secured <br /> location. <br /> All additional sampling will be proposed in this Work Plan amendment will be carried out in <br /> accordance with the procedures established in the original Work Plan and Twining's Standard <br /> Operation Procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.