My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 12:10:00 PM
Creation date
2/14/2019 11:46:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael D and Sharon Olivarez -2- July 9, 2002 <br /> Claim No. 8492 <br /> COST PRE-APPROVAL BREAKDOWN <br /> # Task* Amount Pre-Approved Comments <br /> 1 Installation of One Extraction See various bids and breakdown of <br /> Well,permitting,sampling,pump $12,554 costs in Pre-approval package. <br /> test and discharge <br /> TOTAL PRE-APPROVED $12,554 <br /> * Task descriptions are the same as those identified in the Foothill Engineering May 29, 2002 cost estimate <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of the <br /> costs associated with the new scope of work. <br /> • Although I have referred to the Foothill Engineering proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the proposal dated May 29, 2002 by Foothill Engineering for conducting the <br /> work approved by the oversight agency for implementing the April 11, 2002, Foothill <br /> Engineering Work Plan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms for all necessary future corrective action <br /> work. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and that reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • Subcontractor invoices, <br /> • Technical reports, when available, and <br /> • Applicable correspondence from the oversight agency. <br /> California En vironmenta/Protection Agency <br /> Za Recy led Pape.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.