install replacement wells for MW#1,MW#2,and MW#3.These replacement wells were installed to <br /> correct an over-screen condition of the existing monitoring wells. Also, included in this work plan <br /> was the installation of three CPTs.To date CPT#1,CPT#2 and CPT#3 have been installed. Soil and <br /> groundwater samples extracted during the installation of CPTs indicate gasoline contamination to a <br /> depth of eighty-five feet(see a recap attached). <br /> On May 2 and 3, 2000 the soil borings for both MW#5 and MW#6 were made as described in the <br /> Work Plan of 3/17/2000.Monitoring wells were installed in both of these soil bores.The Work Plan <br /> of 3/17/2000 also included a soil bore and monitoring well (MW#4)to be installed in the sidewalk <br /> on the north side of Lafayette Street. This soil bore was not completed as planned. An unknown <br /> underground storage tank was encountered in the direct path of the soil bore. As a result of this <br /> encounter, the soil bore was abandoned and the local agencies were notified. A recap of the results <br /> of sample analysis for MW#5 and MW#6 are attached. <br /> CPT#3 was installed on June 13,2000 in the Caltrans right of way.This CPT is northeast of the site, <br /> and the data gathered is attached. <br /> All monitoring wells have been sampled quarterly, and a recap of the findings is attached. <br /> WORK PLAN FOR INSTALLATION OF FOUR MONITORING WELLS IN TWO <br /> SOIL BORES <br /> Soil Bore Drilling and Sampling <br /> Soil bores will be drilled with an eight-inch hollow stem auger.The soil borings for MW#7D&S and <br /> MW#8D&S will be sampled beginning at twenty feet of depth on five foot intervals with a standard <br /> BX split spoon soil sampler. Sample tubes will be capped with teflon sheets and sealed with a plastic <br /> cap and duct tape. Each sample will be placed on ice for transport to a certified laboratory under <br /> chain of custody. <br /> Well Placement <br /> Monitoring wells MW#7S and MW#7D (nested wells in a single bore hole) will be located in the <br /> southeast corner of the site. Monitoring wells MW#8S and MW#8D will be located in a single bore <br /> hole located in the driveway on the eastside of the building directly east of the site (see an attached <br /> map). This building is owned by the Michael D. & Sharon Olivarez, and access is available on <br /> request. <br /> Monitoring Well Construction <br /> This plan calls for the placement of two soil bores to a depth of one hundred and twenty-five feet. <br /> Each soil bore will have two monitoring wells installed. A shallow well will be installed at first <br /> groundwater and a deep monitoring well will be installed at one hundred and twenty-five feet(see <br /> well construction detail attached). <br /> The shallow monitoring wells will have an one nch VC asing and will be screen from a depth <br /> of twenty feet to forty feet. The deep monitoring els will be constructed of one ' ch PVC c ing <br /> and have a five-foot screen section to a total depth of one hundred and twenty-five feet. <br /> Page 2 of 4 <br />