Laserfiche WebLink
was the installation of three CPTs. To date CPT41 and CPT#2 have been installed, and findings <br /> reported to the PHS/EHD. Soil and groundwater samples extracted during the installation of CPTs <br /> indicate gasoline contamination to a depth of eighty-five feet(recap attached). <br /> CPT#3 has been delayed, due to the lack of an encroachment permit from Caltrans. The <br /> encroachment permit was applied for on November 11, 1999. <br /> All replacement monitoring wells have been sampled quarterly, and a recap of the findings is <br /> attached. <br /> WORK PLAN FOR INSTALLATION OF THREE DEEP MONITORING WELLS <br /> Well Placement <br /> The plan revolves around the development of a ring of monitoring wells that are as close as possible <br /> to a 100' radius from the center of the UST excavation. The down slope direction of the hydraulic <br /> gradient is to the Northeast in the direction of the Crosstown Freeway. CPT#3 will serve as the <br /> northern most evaluation point. Proposed monitoring wells MW#4 and MW#5 will serve as <br /> evaluation points for the southeast and east directions. <br /> Soil Bore Sampling <br /> The soil boring for MW#4 and MW#5 will be sampled on five foot intervals with a standard BX split <br /> spoon soil sampler. Sample tubes will be capped with teflon sheets and sealed with a plastic cap and <br /> duct tap. Each sample will be place on ice for transported to a certified laboratory under chain of <br /> custody. <br /> Soil sampling from the soil bore for MW#6 is not proposed due the close location to CPT41. Soil <br /> sample analyses for CPT#1 are recorded on the attached recap sheet. <br /> Monitoring Well Construction <br /> Monitoring wells will be constructed of two inch PVC casing in an eight-inch soil bore. The bottom <br /> ten feet of the well casing will be slotted (see an attached sketch). <br /> Monitoring Well Sampling <br /> All new monitoring wells will be developed and purged. After purging, each well will be sampled <br /> for analysis. The static groundwater elevation will be determined before purging. The water table <br /> elevation will be established from City of Stockton Datum. <br /> Sample Analysis <br /> Soil samples will be analyzed by EPA methods 8020 (BETX), 5030/8015(M) (TPH Gasoline)and <br /> 8260(oxygenates). Water samples will be analyzed by EPA methods 602 (BETX), 5030/8015(M) <br /> (TPH Gasoline) and 8260(oxygenates). <br /> Report of Findings <br /> A report of the findings of each soil and water sample analysis will be issued with recommendation <br /> for any future action that may be required. <br /> Future Quarterly Monitoring Well Sampling <br /> After all new monitoring well construction is complete,quarterly monitoring of all wells will begin <br /> Page 2 of 3 <br />