Laserfiche WebLink
NW' -e4 <br /> and continue until terminated by PHS/EHD. <br /> Use of Available Funds <br /> The Underground Storage Tank Cleanup Fund Program has not allocated the funds to this site to <br /> complete this work plan. The owner will complete portions of this work plan as funds become <br /> available from the Underground Storage Tank Cleanup Fund Program. <br /> A General Note <br /> Over three months have past from the date this author made application for a permit to construct a <br /> CPT in the R/W of State Route 4 (crosstown freeway). Lead agency assistance may be required to <br /> obtain this permit. <br /> Please connect Ery Rifenburg of this office if you have any question on this work plan or the funds <br /> available to complete it. <br /> Respectfully submitted, <br /> Fo ll E e ' g <br /> Ervin en , P <br /> cc: Olivarez <br /> ADDENDUM NO. 1 AT THE REQUEST OF MS. CAROL OZ (March 17. 2000) <br /> Proposed Monitoring Well MW#4 will be relocated to the sidewalk on the north side of Lafayette <br /> Street from the Southeast corner of the subject property. Ms. Oz and the author will continue the <br /> effort to secure a permit from Caltrans to place CPT#3 in the Caltrans R/W. <br /> All monitoring wells will be sampled quarterly including those with an over screen condition. Water <br /> samples and soil samples will be analysis by EPA method 8360B. <br /> Page 3 of 3 <br />