Laserfiche WebLink
�... S%wd <br /> %FOOTHILL <br /> ENGINEERING <br /> 12793 PADDY CREEK LANE LODI, CA 95240 <br /> PH. (209) 368-9381 FAX(209) 367-11[),63 <br /> April 11, 2002 <br /> Mr. Michael Infurna <br /> San Joaquin County Public Health Service <br /> Environmental Health Division <br /> 304 E. Weber Third Floor <br /> Stockton, CA 95202 <br /> Site Code#1038 <br /> Global ID#T0607700605 <br /> oti <br /> Subject: Michael D. & Sharon Olivarez Property at 300 S. California St. Stockton, Ca. LjI <br /> Work Plan for Pump Testing Aquifers <br /> Dear Mr. Infurna: <br /> Please find below the Work Plan for a well pump test on the above stated property. <br /> Work Plan for Well Pump Test <br /> Site History <br /> Five fuel USTs and one used motor oil tank were removed by Jim Thorpe Oil in November 1992 <br /> under a permit from the PHS/EHD. Soil samples taken from under the USTs and the dispensing <br /> equipment indicated the presence of hydrocarbons. Spoil from the excavation was found to contain <br /> hydrocarbon contamination. <br /> Clearwater Group submitted a Work Plan to install three soil borings with monitoring wells <br /> constructed in the same boring. The work described in the Clearwater Work Plan was completed <br /> in March of 1995. <br /> The excavation for the removal of the USTs was backfilled by Jim Thorpe Oil in April 1996. The <br /> excavation spoil was used for backfill material. <br /> Foothill Engineering was requested by the owner to sample the three monitoring wells that were <br /> installed by Clearwater at various times and the analysis of those samples is attached. Monitoring <br /> wells MW-1 and MW-2 continue to contain high levels of gasoline contamination.MW-3 has much <br /> lower levels of gasoline contamination(see a recap sheet attached). <br /> On August 23, 1999, the PHS/EHD approved a Work Plan submitted by Foothill Engineering to <br /> install replacement wells for MW#1,MW#2, and MW#3. These replacement wells were installed <br /> to correct the over screen conditions of the existing monitoring wells. Also, included in this Work <br /> Plan was the installation of three CPTs.To date CPT#1,CPT#2 and CPT#3 have been installed. Soil <br /> and groundwater samples extracted during the installation of CPTs indicate gasoline contamination <br /> I <br />