My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 12:35:08 PM
Creation date
2/14/2019 11:52:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIS AUTO REPAIR Page I of I <br /> GW Monitoring Frequency <br /> GEOTRACKER-HOME I MANAGE PROJECTS I REPORTS I SEARCH I LOGIOUT <br /> H/S AUTO REPAIR(TO607700605)-MAP THIS SITE OPEN-REMEDIATION <br /> 300 CALIFORNIA ST S CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON , CA 95206 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP(LEAD)-CASE#:1038 <br /> CASEWORKER:MICHAELINFURNA - SUPERVISOR:NONE SPECIFIED <br /> SAN JOAQUIN COUNTY PUBLIC WEBRAGE CENTRAL VALLEY RWQCB(REGION 5S)-CASE#.-390772 <br /> VIEW PRINTABLE CASE SUMMARY-FOR THIS SITE CASEWORKER:JAMES BARTON - SUPERVISOR:JAMES MUNCH <br /> CUE Claim It: CUE Priority Assigned: CUE Amount Paid: <br /> 8492 B $530,336 <br /> THIS PROJECT WAS LAST MODIFIED BY MICHAEL 1ALFURNA ON 7/20/2010 12:58:01 PM-HISTORY <br /> THIS SITE HAS SUBMITTALS,CLICK HERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> GROUNDWATER MONITORING FREQUENCY THIS VERSION IS FINAL AS OF 712012090 SAN MONITORING FREQUENCYHISTORY <br /> GIN MONITORING AT SITE? (0- YES (- NO(NO GW WELLS OR NO GW MONITORING REQUIRED) <br /> DIRECTIVE LETTER-DATE SENT 3/512009 <br /> BEFORE CURRENT <br /> MONTHLY r_0 r_0 <br /> r <br /> QUARTERLY 14 2F <br /> r <br /> SEMI-ANNUAL <br /> F__0 <br /> ANNUAL F_6 F ----- <br /> 6 <br /> OTHER F_O 9 <br /> REASONS FOR MONTHLY OR QUARTERLY GROUNDWATER MONITORING <br /> F_ Assessment incomplete <br /> F_ WDR Permit Requirement <br /> Well Being Sampled During Remedial Action for Progress Assessment <br /> Well Being Sampled For Free Product Evaluation and Reduction Verification <br /> Well Being Sampled Within First Year of Being Installed <br /> F MW-10 & MW-11 installed July 13, 2010 <br /> F_ Well Being Sampled for Post-Remedial Action Verification Monitoring <br /> F_ Well Has Not Shown Reliable Consistency Yet To Warrant Reduction in Sampling Frequency <br /> F_ Well Is Last Point of Monitoring Prior to possible impact to Receptor <br /> F_ Other <br /> SPELL CHECK <br /> Save as in Progress save as Final <br /> LOGGED IN AS INFURNAM CONTACT GEOTRACKE-R-H-ELP <br /> https:Hgeotracker.waterboards.ca.gov/regulators/screens/menu.asp?GLOBAL—ID=TO6077... 7/20/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.