My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000896
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
300
>
3500 - Local Oversight Program
>
PR0544147
>
ARCHIVED REPORTS XR0000896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 2:51:31 PM
Creation date
2/14/2019 1:18:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000896
RECORD_ID
PR0544147
PE
3526
FACILITY_ID
FA0004522
FACILITY_NAME
SKIPS SERVICE STATION
STREET_NUMBER
300
Direction
S
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14909501
CURRENT_STATUS
02
SITE_LOCATION
300 S CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> �3/1712000 also included a soil bore and monitoring well(MW#4)to be installed in the sidewalk on the <br /> north side ofLafayette Street.This soil bore was not completed as planned.An unknown underground <br /> storage tank was encountered in the direct path of the soil bore. As a result of this encounter,the soil <br /> ;. bore was abandoned and the local agencies were notified. <br /> CPT43 was installed on June 13,2000 in the Caltrans right of way.This CPT is northeast of the site, <br /> and the data gathered is in the report issued for that work. <br /> All monitoring wells have been sampled quarterly, and a recap of the findings is attached. <br /> A Work Plan to expand the horizontal definition of the contamination plume was approved in December <br /> of 2000.This Work Plan called for the installation of three new CPT's within the Caltrans R/W to the <br /> north of the project site. These CPT's were completed on March 8,2001 and soil and water samples <br /> were extracted to a depth of 125 feet. Also, included in the Work Plan of December 2000 was the <br /> installation and testing offour new monitoring wells,(MW-8S,MW-8D,MW-7,MW-9) to be placed <br /> on the project site or the adjacent property. These monitoring wells were completed on April 11,2001. <br /> Procedure <br /> On September 19,2001, Del Tech Geotechnical Support Services secured water samples from all of <br /> the monitoring wells on the above stated property.The work was supervised by Foothill Engineering. <br /> All monitoring wells were in good condition and samples were taken using the standard recommended <br /> procedures.All samples were extracted using the tube with check valve pump system.Purge volumes <br /> were+/- 1 g.p.m. and the physical properties of the groundwater can be found in the Del-Tech Field <br /> Report. <br /> The replacement and original monitoring wells were sampled for analysis and the original monitoring <br /> . wells(MW-1,MW-2,MW-3)were used to establish groundwater elevation and hydraulic gradient. <br /> All samples were transported under chain of custody to Sherwood Labs of Hilmar, California for <br /> analysis by EPA methods 602 and 503018015. All water sample analysis and groundwater elevations <br /> are summarized in the attached tabular recap sheet.Copies of the original Laboratory data sheets from <br /> this sampling event are also attached and are a part of this report., <br /> Findings <br /> The groundwater elevation in the wells has lowered+/-0.6 feet for both the shallow and deep wells from <br /> the last sampling date of June 28,200 1. MW-1 continues to have the highest concentration of gasoline <br /> contamination(TPHg)at 203,000 ppb.which is higher than 133,000 ppb.of the last sampling event. <br /> MW-8S has recorded a major change with a drop in TPHg to non-detect(Report limit of 50 ppb),from <br /> a high of 14,000 ppb.for the first groundwater sample from this well.Please review the recap sheet that <br /> is attached. <br /> The groundwater hydraulic gradient was calculated at S=0.0026 with the down slope in the Southeast <br /> direction. This gradient applies to the shallow well data only(see a site map attached). <br /> Conclusions <br /> The hydraulic gradient for this monitoring event has changed from the traditional hydraulic gradient <br /> direction of northeast to a bearing of South75East. This direction change may account for the major <br /> drop in gasoline contamination in monitoring well MW-8S. The slope of the hydraulic gradient has <br /> increased to 5=.0026 for this event, from 5=.0015 of the last event. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.