Laserfiche WebLink
13 September 2012 <br /> AGE-NC Project No.99-0682 <br /> Page 10 of 17 <br /> 4.2.2. Progress-ISCO: Analytical Results - 07 June 2012 <br /> On 07 June 2012, groundwater samples were collected from wells MW-1 A, MW-6, MW-7 <br /> and MW-8. The following is a summary of the analytical results: <br /> • TPH-g were detected in the samples collected from wells MW-1A, MW-6, MW-7 <br /> and MW-8 at concentrations between 260 Ng/I (MW-6) micrograms per liter (pg/1) <br /> and 93,000 pg/1 (MW-1A). <br /> • TPH-d were detected in the samples collected from wells MW-1A, MW-7 and MW-8 <br /> at concentrations between 1,230 pg/I (MW-7) and 29,000 pg/I (MW-1 A). <br /> • One or more BTEX compound was detected in samples collected from MW-1A, <br /> MW-6, MW-7, MW-8 at maximum concentrations of 820 pg/I benzene (MW-7), <br /> 5,400 pg/I toluene (MW-1A), 780 pg/I ethylbenzene (MW-1A) and 4,500 pg/I total <br /> xylenes (MW-1A). <br /> • TAME was detected in samples collected from well MW-7 at a concentrations of <br /> 7.0 pg/l. <br /> • 1,2-DCA was detected in samples collected from wells MW-7 and MW-8 at <br /> concentrations of 13 pg/I and 11 pg/I, respectively. <br /> • Various metals were detected in samples collected from wells MW-1A, MW-6, <br /> MW-7, and MW-8; Fe and Al increased significantly in samples collected from well <br /> MW-8 compared to baseline concentrations, while concentrations of Fe decreased <br /> in well MW-1A compared to baseline results. CrVI and Cr were not detected above <br /> laboratory reporting limits in the samples collected (Table 4). <br /> • Anions (bromate, bromide, chloride, nitrate, nitrate as nitrogen, nitrate as NO3 <br /> sulfate, ammonia, and TDS) were detected in the samples collected from wells <br /> MW-1A, MW-6, MW-7 and MW-8. Generally, anion concentrations decreased <br /> (bromate and bromide) or remained stable in MW-1A; increased slightly (bromate <br /> and bromide) or remained stable in MW-6 and MW-7, and increased in MW-8 <br /> compared to baseline concentrations (Table 5). <br /> 4.2.3. Progress-ISCO: Analytical Results - 21 June 2012 <br /> On 21 June 2012, groundwater samples were collected from wells MW-1A, MW-6, MW-7 <br /> and MW-8. The following is a summary of the analytical results: <br /> • TPH-g were detected in the samples collected from wells MW-1A, MW-6 and MW-7 <br /> Advanced GeoEnvironmen[al,Inc. <br />