My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
602
>
3500 - Local Oversight Program
>
PR0544148
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 6:16:53 PM
Creation date
2/14/2019 2:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544148
PE
3526
FACILITY_ID
FA0005937
FACILITY_NAME
NEAL STALLWORTH AUTO DETAIL
STREET_NUMBER
602
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13916509
CURRENT_STATUS
02
SITE_LOCATION
602 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 January 2014 <br /> AGE Project No . 99-0682 <br /> Page 5 of 28 <br /> and CPT4with maximum concentrations detected in the groundwater samples from <br /> CPT-3 as high as 9, 300 tag/I benzene and 49 , 000 pg/I toluene in HUB, and 5,500 <br /> tag/I ethylbenzene and 25 , 500 tag/I total xylenes in HU9/10 . 1 ,2-DCA was detected <br /> in the water samples collected only from CPT-3 at concentrations of 37 pg/1 in HU8 <br /> and 23 tag/I in HU9/10 . <br /> January 2006 - One soil boring was advanced and two deep groundwater <br /> V monitoring wells (MW-1 C and MW- 1 D ) were installed at the site. A CME-95 truck- <br /> mounted drill rig was utilized to advance soil borings B-4, MW-1C and MW-1D to <br /> total depths of 150 feet below surface grade (bsg ), 135 feet bsg and 150 feet bsg , <br /> respectively, using 8-inch diameter hollow-stem augers . Soil samples were not <br /> collected in borings MWA C and MWA D . No soil samples were collected in boring <br /> B-4 until 50 feet bsg . Pilot borings MWAC and MW-1D were completed as <br /> groundwater monitoring wells of the same designations using 2-inch diameter <br /> polyvinylchloride ( PVC) casing with 0. 010-inch slotted screen installed from 125 feet <br /> to 135 feet bsg and 140 to 150 feet bsg , respectively. <br /> TPH-g was detected in the soil samples collected from B-4 at 60 feet, 70 feet, 90 <br /> cOAy , ' feet, 100 feet, 130 feet and 149 feet bsg . Concentrations ranged from 2 . 0 mg/kg <br /> t� t� (134- 100) to 2 , 500 mg/kg (134-70). BTEX constituents were detected in the boring B4 <br /> %P, L,t samples from 60 feet, 80 feet, 90 feet, 130 feet and 149 feet. Maximum <br /> concentrations were detected in sample 134-70 at 4 .7 mg/kg benzene , 32 mg/kg <br /> toluene , 7. 9 mg/kg ethylbenzene and 45 mg/kg xylenes . <br /> January 2006 - Soil boring CPT-5 was advanced off-site , at 540 North California <br /> Street utilizing CPT technology to model the geologic and hydrogeologic framework <br /> and to assess potential dissolved petroleum migration from the site . Lithologic data <br /> was collected from an initial CPT soil boring ; adjacent borings were then advanced <br /> to collect grab groundwater samples from selected depths . Soil boring CPT-5 was <br /> advanced to a total depth of 200 feet bsg . Groundwater samples were collected <br /> from the CPT boring at the following intervals : 59 to 63 feet bsg , 72 to 75 feet bsg , <br /> 104 to 108 feet bsg , 117 to 121 feet bsg , and 171 .5 feet and 174 . 5 feet bsg . <br /> Additionally, soil probe borings P-521 - 1 , P-521 -2 and P-521 -3 were advanced off- <br /> site at 521 East Oak Street, the dirt parking area to 537 East Oak Street, utilizing <br /> a van-mounted Geoprobe 5400 direct-push probing unit. All borings were advanced <br /> to 44 feet bsg , and a grab groundwater sample was collected at total depth of each <br /> boring . No analytes of concern were detected in the grab groundwater samples <br /> collected from CPT-5 and probe borings P-521 - 1 , P-521 -2 and P-521 -3 . <br /> jApril 2007 - Two groundwater monitoring wells (MW-7 and MW-8) and four vapor <br /> extraction wells (VW- 1 through VW-4) were installed at the site . Pilot borings VW-1 <br /> and VW-3 were completed as vapor extraction wells with slotted screen installed <br /> from approximately 20 to 30 feet bsg ; pilot borings VW-2 and VW4 were completed <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.